I was impressed by that. Seeing as the field was not like this early in there year, they must have started to cut the grass in this pattern, if so someone is very good at operating their mower.
Priestly demolishing the Southbound lanes of the Simcoe Street overpass in Oshawa. The barriers are moved and sand is spread for road protection. It only took about an hour to get to this stage of the demo.
The last of the land bridges have been severed to the break waters at the Jim Tovey Conservation area. Multiple pumps have been draining the water filled cells on the Lakeview site.
Part of the Cat 5110BL has arrived onsite. The largest sewer configured digging excavator around these parts, weighing in around the 284,000 lb + range. This unit is brought in when high breakout forces are needed in excavations.