  1. C

    Toronto Pinnacle One Yonge | 345.5m | 105s | Pinnacle | Hariri Pontarini

    That upper glass covering the transfer slab just makes this building look a thousand times more finished and we aren't even at a third yet
  2. C

    Toronto Concord Canada House | 231.97m | 74s | Concord Adex | Arcadis

    So not going to lie as the top gets squared off these two look a little bit better still missed the mark by a freaking mile but could be a million times worse
  3. C

    Toronto KING Toronto | 57.6m | 16s | Westbank | Bjarke Ingels Group

    Every time this thread appears with an update I keep looking for cladding 😂
  4. C

    Toronto Forma | 308m | 84s | Great Gulf | Gehry Partners

    Breaking forma phase 1 digs to grade gets their crane installed is now on I believe their second level of parking and Pemberton thankfully is still a hole 😂😂😂
  5. C

    Toronto The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

    Grade beams are poured separately with the floor being poured the next day why bloorman & Benito are the greatest contributors to this thread Love that I could go back and find this
  6. C

    Toronto The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

    So I can't remember if the beams are poured separately or as part of the main floor anyone remember from last time
  7. C

    Toronto Sugar Wharf Condominiums (Phase 2) | 299m | 90s | Menkes | a—A

    The yellow tool you were seeing is a compaction tester there is a steak that is driven into the ground on the side of the machine that registers the density of the ground below
  8. C

    Toronto Y&S Condos | 130.77m | 38s | Tribute | Graziani + Corazza

    Something I learned from talking on the sky Tower thread is luffing cranes are much slower than a hammerhead so could have been due to site constraints they needed to use that crane till they reached the podium and could switch to a hammerhead
  9. C

    Toronto The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

    Looks like one beam left to be tied and then they can start on the floor layout
  10. C

    Mississauga Exchange District Condos | 232m | 72s | Camrost-Felcorp | Arcadis

    Sorry that was my bad on the context I meant of the box on box but you did answer my question so thank you
  11. C

    Mississauga Exchange District Condos | 232m | 72s | Camrost-Felcorp | Arcadis

    Is the current tower under construction the taller or shorter one
  12. C

    Toronto 50 Scollard | 147.62m | 41s | Lanterra | Foster + Partners

    This tower looks twice as tall because of how slim it is absolutely love it
  13. C

    Toronto The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

    I feel like with the way the organization and communication has gone on with this project we will probably find out if we're going to 91 when they pour the 85th floor
  14. C

    Toronto Pinnacle One Yonge | 345.5m | 105s | Pinnacle | Hariri Pontarini

    Yeah but sky Tower has done about four floors in the time that the mechanical floor is still under construction we're currently at floor 26 here I think and floor 58 at the one so if sky grid doesn't maintain the one floor a week pace it is foreseeable that this building could beat it to 85
  15. C

    Toronto The Pemberton | 215.79m | 68s | Pemberton | a—A

    So do we want to say which happens first Crane comes down at 11YV or Pemberton hits ground level
  16. C

    Toronto Pinnacle One Yonge | 345.5m | 105s | Pinnacle | Hariri Pontarini

    So I may have to eat my words cuz this actually might catch the one
  17. C

    Toronto The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

    Literally been checking the site everyday waiting for this viewpoint to get posted looks like we will start seeing forming for floor plate soon
  18. C

    Toronto The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

    And there are those beautiful hangers RCS has really picked up pace though will be interesting to see what happens when they get to the next mechanical floor
  19. C

    Toronto The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

    It would appear that we have completed the pour for the second level of the mechanical floor so we should be seeing them beginning to move mechanical fixtures into place before beginning forming for the next floor then I imagine we will see you pace pick up those sky grid may take abit to get up...
  20. C

    Vaughan CG Tower | 188.97m | 60s | Cortel Group | BDP Quadrangle

    It would appear that we have gotten to height on this tower which is awesome with it and festival coming into Vaughn south on the 400 is an absolutely imposing view especially since I find a lot of the buildings in this cluster better looking than most of Toronto