News   Jul 12, 2024
 1K     0 
News   Jul 12, 2024
 873     0 
News   Jul 12, 2024
 353     0 

Search results

  1. SaugeenJunction

    Hamilton Confederation GO Station | ?m | 1s | Metrolinx

    The station buildings seem to progressing well. Any work on the in-corridor platforms yet?
  2. SaugeenJunction

    GO Transit Fleet Equipment and other

    The Lakeshore Lines have always been the prime candidate for electrification. I wouldn't say the other lines are on the backburner, rather that ONxpress can only mobilize so many resources at once to do electrification work. It makes sense to focus on a line (or a pair of lines) at a time, and...
  3. SaugeenJunction

    GO Transit Fleet Equipment and other

    I think we should expect a phased approach.
  4. SaugeenJunction

    Mississauga Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    Great read - thanks for your work cobbling these documents together. It will always be the Hurontario LRT in my heart!
  5. SaugeenJunction

    GO Transit Fleet Equipment and other

    I’m hearing reliability with the existing diesels is a massive issue too. They’re electrifying the network so they need fewer diesel locos as OP said.
  6. SaugeenJunction

    Waterloo Region Transit Developments (ION LRT, new terminal, GRT buses)

    Frequency is always King, but as pointed out above the region may not want to spend on more service. Might actually be easier for Waterloo to order more trains for double-length service with one of the Fed’s electric transit vehicle programs.
  7. SaugeenJunction

    Finch West Line 6 LRT

    Ignore the editing and trespassing but some testing footage:
  8. SaugeenJunction

    GO Transit Fleet Equipment and other

    13 locomotive tender was cancelled. The procurement plan outlines a new order/tendering process with a larger number of locomotives.
  9. SaugeenJunction

    GO Transit Fleet Equipment and other

    204 has been placed mid-train and moved to beside the main at Willowbrook.
  10. SaugeenJunction

    Mississauga Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    Metrolinx is genuinely unable to properly plan transit because of incompetence and a flawed business case methodology, and requires political interference to get stuff done. They can’t even write their own 2051 Regional Transportation Plan and have subbed out the work to HDR, spending only...
  11. SaugeenJunction

    GO Transit Fleet Equipment and other

    They look so good wow.
  12. SaugeenJunction

    GO Transit: Construction Projects (Metrolinx, various)

    The renderings show two platforms, so two tracks would be included.
  13. SaugeenJunction

    GO Transit: Construction Projects (Metrolinx, various)

    Cross-posting from the Orbit thread. Innisfil GO renderings:
  14. SaugeenJunction

    Innisfil Orbit | ?m | 40s | Cortel Group | Arcadis

    New renderings of the future Innisfil GO, the anchor of the development. Source.
  15. SaugeenJunction

    GO Transit: Service thread (including extensions)

    Absolutely not. Metrolinx and ONxpress both know what service is planned for the near future. The 2024 increases will support future increases.
  16. SaugeenJunction

    Finch West Line 6 LRT

    Long train, tight curve:
  17. SaugeenJunction

    Mississauga Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    Agree. Especially because Burlington will be the end of electrified super-frequent service for GO Expansion. I'd be okay with them adding a West Harbour stop on the Maple Leaf to NYC also in this scenario.

Back
Top