News   Mar 01, 2024
 1.9K     4 
News   Mar 01, 2024
 3.7K     0 
News   Mar 01, 2024
 935     0 

Search results

  1. A

    Toronto Ontario Line: King-Bathurst Station | ?m | ?s | Metrolinx | HDR

    March 2 - Late afternoon, some further demolition pictures of the south side of King Street, as of the end of the work day:
  2. A

    Toronto Portland Commons | 71.7m | 15s | Carttera | Sweeny &Co

    A few more from Saturday, March 2. First, several photos of the work being done around the ground level perimeter of the new building, and then secondly, a couple of photos of the now largely hidden legacy 510 Front Street West building. Along Front Street: Along Portland Street...
  3. A

    Toronto Portland Commons | 71.7m | 15s | Carttera | Sweeny &Co

    A few more from Saturday, March 2. First, several photos of the work being done around the ground level perimeter of the new building, and then secondly, a couple of photos of the now largely hidden legacy 510 Front Street West building. Along Front Street: Along Portland Street...
  4. A

    Toronto Ontario Line: King-Bathurst Station | ?m | ?s | Metrolinx | HDR

    March 2 - Saturday late morning. Almost nothing left of the buildings on the north side of King Street, a couple of stub walls plus a lot of debris to be cleared away. On the south side, demolition of the remaining portion of the Banknote building is proceeding quickly - a crew is even working...
  5. A

    Toronto KING Toronto | 57.6m | 16s | Westbank | Bjarke Ingels Group

    March 2 - Both King Toronto tower cranes working all Saturday morning.
  6. A

    Toronto Portland Commons | 71.7m | 15s | Carttera | Sweeny &Co

    Saturday - March 2. Just one overview photo from this morning. Also, a quick note regarding the Terroni truck - not entirely out of place here, after all the Terroni corporate offices are, and have been for a long while, in the legacy Portland Commons building at 510 Front Street (the...
  7. A

    Toronto Ontario Line: King-Bathurst Station | ?m | ?s | Metrolinx | HDR

    We live across the road from the buildings on the north side of Stewart Street. While there was some business use unites in the brick buildings backing on the Banknote building, they were definitely residential or live work units there. We met some of the residents - including incidents of...
  8. A

    Toronto 88 Bathurst | 68.3m | 17s | Hines | 3XN

    February 26:
  9. A

    Toronto Ontario Line: King-Bathurst Station | ?m | ?s | Metrolinx | HDR

    Two more from today - North side of King Street, a couple of panelized facade sections ready to go to off-site storage for the next few years, waiting to be incorporated into the new station structures. Second photo, just rubble left for most of the lot south of King Street.
  10. A

    Toronto Ontario Line: King-Bathurst Station | ?m | ?s | Metrolinx | HDR

    Monday morning, February 26: Coming down quickly now.
  11. A

    Mississauga Eleven 11 Clarkson | ?m | 4s | Saxon Developments | KFA

    February 25: Well, as of this morning, the Saxon Developments web site is still up - however when a Google search is done, the associated information block on the right hand side of the page showing the map location of the Saxon office (197 Spadina, Suite 500) has a 'Temporarily Closed' flag...
  12. A

    Toronto Toronto Western Hospital: Patient Care Tower | 84.14m | 15s | University Health Network | DIALOG

    From driving by on Bathurst Street (so unable to get a picture) this afternoon, the equipment in the parking lot is either ground sampling drilling, or from the amount of it on site, I think perhaps more likely (and hopefully) to be geothermal heating/cooling system drilling equipment.
  13. A

    Toronto Portland Commons | 71.7m | 15s | Carttera | Sweeny &Co

    February 23: A lot of activity around the building's ground level perimeter on Friday.
  14. A

    Toronto Ontario Line: King-Bathurst Station | ?m | ?s | Metrolinx | HDR

    February 22 - more demolition photos.
  15. A

    Toronto Freed Hotel & Residences | 219m | 63s | Freed | AS + GG

    February 22: Preparing the sales suite - both inside, as well as a new exterior along Duncan Street.
  16. A

    Toronto Natasha Residences | 156.9m | 47s | Lanterra | BDP Quadrangle

    Almost a month later, and still no action. The only change has been a coat of black sealant applied to the adjoining building.
  17. A

    Toronto Theatre District Residence & Riu Plaza Hotel | 156.05m | 49s | Plaza | BDP Quadrangle

    February 22: Attaching front facade sections:
  18. A

    Toronto 19 Duncan | 186.53m | 58s | Westbank | Hariri Pontarini

    February 22. Visible activities at 19 Duncan are the ongoing enclosing of the building envelope where the external construction hoist was located, and of the main residential and garage entrances on the east side of the building.

Back
Top