News   Jul 15, 2019
 1.2K     1 
News   Jul 15, 2019
 489     1 
News   Jul 15, 2019
 438     0 

Search results

  1. H

    GO Transit Electrification (Metrolinx, Proposed)

    OK now we have battery on top of hydrail and catenary
  2. H

    Ontario Line (was Relief Line South, in Design)

    oops, there is a problem here...
  3. H

    Ontario Line (was Relief Line South, in Design)

    Can we expect something similar for Ontario Line when the election looms?
  4. H

    Hurontario LRT | Metrolinx

    I It would be so dumb not to connect with Kitchener GO
  5. H

    Ion Light Rail (Kitchener-Waterloo) & King/Victoria Transit Terminal

    20kmh limit? That is insane. How is this rapid transit?
  6. H

    Ion Light Rail (Kitchener-Waterloo) & King/Victoria Transit Terminal

    Good luck backing out of that driveway...
  7. H

    Crosstown LRT | Metrolinx

    Not trying to ruin the party or be a bad ass, but other cities in the world do this underpinning in their subway system all the time. For sure it is not the easiest engineering and construction job, but not sure why it is such a big deal in Toronto.
  8. H

    Crosstown LRT | Metrolinx

    But there is nothing to stop it if anyone turns.
  9. H

    Crosstown LRT | Metrolinx

    what is this for?
  10. H

    Crosstown LRT | Metrolinx

    ^i will believe when I see it.
  11. H

    Crosstown LRT | Metrolinx

    ^if signal priority is not implemented, this will become the glorified version of streetcars. People should not be blamed if they complain about it.
  12. H

    Metrolinx: Finch West LRT

    Queens Quay happened quit alot until they put in the stopping gate...
  13. H

    GO Transit: Service thread (including extensions)

    ^I will believe it when I ride it.
  14. H

    GO Transit: Service thread (including extensions)

    It also makes sense with this new kids ride free policy...
  15. H

    Metrolinx: Finch West LRT

    ^until it gets stuck by vehicles driving on the track or into the tunnel...
  16. H

    Downtown Markham

    ^I am not sure I am that positive. 3 of the 4 approved are under construction and the other is York U Markham, which is not happening. The proposed ones have been talked about years ago with no movement...
  17. H

    GTHA Regional Transit Amalgamation Discussion: Superlinx/Subway Upload

    <blockquote class="twitter-tweet"><p lang="en" dir="ltr">Here’s the province’s proposed amendments to the Metrolinx Act. They would allow the province to designate “new rapid transit projects or rapid transit expansion projects” as “the sole responsibility of Metrolinx.” City and TTC would be...
  18. H

    Ottawa Transit Developments

    https://www.theconstructionindex.co.uk/news/view/kiewit-and-vinci-close-25bn-canadian-lrt-deal

Top