Toronto The RIV | 127.81m | 37s | Broccolini | Arcadis

I believe they’re de-watering the site to lower the water table.

I was stunned at first to see what I thought was a piling rig, but it turned out to be a hydraulic press to insert the dewatering pipes. (Those 2 meter long oxidized pipes on the rig)

This afternoon around 2:30.
IMG_1320.jpeg
IMG_1321.jpeg

IMG_1322.jpeg


And, from the end of the day
IMG_1336.jpeg


Not sure if it’s running or not, but, everything is hooked up and ready to go.
 

Back
Top