Toronto Royal Ontario Museum | ?m | ?s | Daniel Libeskind

Assembly of the canopy is coming together.

IMG_2590.jpeg
IMG_2588.jpeg


Over in the back, they've removed some of the original crystal's cross beam supports which opens up the future entrance.

Before:
screenshot-2025-05-04-at-19-47-04-png.648535


Part of the new entrance ramp is in place. The round concrete is where the rotating entrance doors will go.
IMG_2589.jpeg


We're still aways to go for the new entrance to open but the major structural engineering reconfiguration is largely done.
 
Last edited:
First piece of glass is installed.

IMG_3289.jpeg


The main canopy and the entrance canopy are fully built, pending cladding.

IMG_3287.jpeg


Hariri Pontarini did a good job of making this feel congruent with Libeskind's angles. It's as if it were always supposed to be this way.

IMG_3290.jpeg



But the difference in cladding and window framing from Libeskind's grey and black to Pontarini's brown tones will feel like it's pending yet another update, hopefully not too far in the future.

IMG_3293.jpeg


Plumbing is going in for the water feature.

IMG_3294.jpeg
 
Is it just the entrance renovation under construction now ? When do they plan to start on sunlit atrium space and other interior work?
 