Toronto The United BLDG | 184.85m | 54s | Davpart | B+H

20260316_111943.jpg
20260316_111918.jpg
 
Almost every website I’ve visited on this project mentions that there will be an eventual PATH connection. With the closest entrance being city hall I can’t see this being the case for a very long time . Does anyone know of any plans to expand PATH towards this site?
 
We have windows folks, windows!

IMG_2341.jpeg



IMG_2343.jpeg


I've also noticed that vertical support poles have been removed for most of the floors. Still some left in the lower 3 levels.
IMG_2342.jpeg
IMG_2340.jpeg


Over at the base, concrete forming has been done, and metal framing is being added in the centre, awaiting glazing along the entire front.
IMG_2339.jpeg
IMG_2338.jpeg
 
Almost every website I’ve visited on this project mentions that there will be an eventual PATH connection. With the closest entrance being city hall I can’t see this being the case for a very long time . Does anyone know of any plans to expand PATH towards this site?
There are no plan at all that would connect this to the PATH network. Maybe those websites you mention are misconstruing the fact that this will have a direct connection to the subway network as the same thing as being PATH connected. It is just one step removed...

42
 
March 22nd. I tried to get a shot to show a bit more of the window wall but the distances/angles are still tricky. It looks ok in person (at least to me it doesn't look particularly cheap)


IMG_0609.jpeg
IMG_0608.jpeg
IMG_0605.jpeg
IMG_0604.jpeg
 

Attachments

  • IMG_0611.jpeg
    IMG_0611.jpeg
    204.5 KB · Views: 6
  • IMG_0610.jpeg
    IMG_0610.jpeg
    256.5 KB · Views: 7
  • IMG_0607.jpeg
    IMG_0607.jpeg
    212.7 KB · Views: 6
  • IMG_0603.jpeg
    IMG_0603.jpeg
    234 KB · Views: 6

Back
Top