kotsy
Senior Member
According to Waterfront For All's annual review, construction on this park is supposed to start this year even though a design hasn't been unveiled.
There's no indication that construction would start here for many months. Lots of time to unveil concepts, get feedback, make changes, and still start some portion of it before the end of the year.Starting construction without any community consultation on the new design? Being built this year means they already have an engineering design and a contractor hired to build it. During the World Cup? Wawatesi park on Richmond and John got delayed until after the World Cup. Something smells fishy. Waterfront For All isn't a reliable source, I'll take this with a grain of saltwater.
There's no indication that construction would start here for many months. Lots of time to unveil concepts, get feedback, make changes, and still start some portion of it before the end of the year.
42
I disagree. Wawatesi Park, which is much smaller, was in the engineering drawing phase last year for construction starting In August or September of this year. Community feedback comes at the conceptual design phase, not when work is being done on engineering design to build the thing. As @Northern Light points out, this is probably just a lawn and a few benches as a placeholder for a much later process to build the aquatic centre.