Photos taken today, Friday (Jan. 23). Very cold out there today, -13 or so, in the -20s with the wind. Since I posted last Friday, the east Rail Climbing System (RCS), installing the building's skin, is up a level to floor 80.... and one wonders if that's as high as the RCSs can go? The bottom rim of the 79th floor, newly installed, is visible on the east face and partly installed on the north face. The north RCS at 79, the west at 77 or so.
Buncha crap on the camera sensor that I mostly cleaned up, but some might be visible...
www.flickr.com
Buncha crap on the camera sensor that I mostly cleaned up, but some might be visible...
One Bloor West (The One) "time-lapse"
From October, 2020, as above-ground construction started in earnest at The One (1 Bloor W.) in Toronto. More or less a weekly photo usually taken on a Friday, with some gaps during early-on construction hiatuses. The initial photographs are from 2015, during demolition at the site, 2018, during...