rbt
Senior Member
Pickering refurbs of reactor 5 through 8 have been approved and funded.
This is a timeline for Bruce/Darlington refurbishments. It''s not clear when Pickering will start.
www.powermag.com
I presume this giant stack of Hydrogen which seems to replace natural gas in the 2050 Ontario grid is also somehow related to Nuclear generation: time shifting night nuclear generation to daytime via hydrogen storage.
This is a timeline for Bruce/Darlington refurbishments. It''s not clear when Pickering will start.
![ontarionuclearrefurbishmentschedule-ieso2022-scaled.jpg](https://www.powermag.com/wp-content/uploads/2024/02/ontarionuclearrefurbishmentschedule-ieso2022-scaled.jpg)
![www.powermag.com](https://www.powermag.com/wp-content/uploads/2024/02/pickering-station-2004-2732-scaled.jpg)
Ontario Green Lights Nuclear Refurbishment of Pickering CANDU Units
Ontario Power Generation (OPG) will refurbish four units at the Pickering Nuclear Generating Station, Canada’s first major commercial generation plant—
![www.powermag.com](https://www.powermag.com/wp-content/uploads/2020/11/cropped-p-power-32x32.jpg)
I presume this giant stack of Hydrogen which seems to replace natural gas in the 2050 Ontario grid is also somehow related to Nuclear generation: time shifting night nuclear generation to daytime via hydrogen storage.
![ieso-p2d-graphic.jpg](https://www.powermag.com/wp-content/uploads/2024/02/ieso-p2d-graphic.jpg)
Last edited: