Erin Mills Expansion & Cineplex Junxion | 14.75m | 1s | OPB | MMC Architecture

Drains went in.
June 25
DJI_0178.JPG
 
I Don't have photos of it but when I drove by Tuesday it was almost fully enclosed.

Based on the pace of construction I think a summer opening is achievable.
 
Did they remove the mid-sized theatre in the middle shown on the plans above?
Or did they reconfigure so they are all doubled up across a corridor now?
Yeah looks like they scaled back the project quite a bit and did some reconfigurations. The Patio/Upper level also seem to be non-existent based on the current construction when comparing to the initial plans.
 