Toronto 980 Lansdowne Avenue | 101.14m | 36s | Neudorfer | Gabriel Bodor

Nov 13, 2021


20211113_141818.jpg
20211113_141825.jpg
 
The lack of overhead construction barrier/boarding is unsettling and concerning.

A rough estimate is the distance from the concrete tower forms to the street fence barrier looks to be around 1 to 1.5 metres.

Pedestrian traffic flow along the sidewalk here is steady at times, with people doing their shopping at Dupont or just moving around the neighbourhood in general.

I've sent an email to local councillor Ana Bailao to hopefully get this addressed.


20220222_082418.jpg
20220222_082423.jpg
20220222_082557.jpg
 
A few other people in our Davenport Village Facebook group have also sent notifications to the Ana Bailao's office, and looks like they've got the builder to respond with setting up the overhead barriers. Albeit skimping out on the extent of where the barrier length ends:


20220304_180907.jpg
20220304_180945.jpg
20220304_181003.jpg
20220304_181015.jpg
20220304_181017.jpg
 

Back
Top