Vaughan Charisma Condominiums Phase 1 | 93.45m | 26s | Greenpark | Kirkor Architects

From today:

20210502_182933.jpg
20210502_182936.jpg
20210502_183034.jpg
20210502_183039.jpg
20210502_183144.jpg
20210502_183150.jpg
20210502_183254.jpg
20210502_183316.jpg
20210502_183321.jpg
20210502_183344.jpg
20210502_183825.jpg
20210502_183831.jpg
20210502_183854.jpg
20210502_183858.jpg
 
I'm not really able to be certain how many cranes are on that site now based on those photos. I'm assuming that's still four, but if you can add some certainty @DarkSideDenizen, that would be great!

42

Yes, I believe there ae 4 cranes:

The crane on the west tower of "Phase 1" has been removed. The crane on the east tower of "Phase 1" still stands.

There are two cranes on Phase 2 (the tower/phase furthest south)., and there is 1 crane in the pit (Phase 3. "The 5th at Charisma") directly between Phases 1 and 2.

At some point they swapped out the fixed boom/horizontal crane on Phase 2 with a second variable boom crane. It may be the same tower crane they disassembled from the west tower of Phase 1, just relocated to Phase 2.
 

Back
Top