Toronto Michael Garron Hospital, Toronto East Health Network | ?m | 8s | Infrastructure Ontar | Diamond Schmitt

Didn't get a chance to grab a pic today..........but noted the building is topped out;

At least appeared so from the north.
 
The new tower is topped out.
20200819_101103.jpg
20200819_101103.jpg
20200819_103551.jpg
 

Attachments

  • 20200819_102928.jpg
    20200819_102928.jpg
    384.8 KB · Views: 238
Police have arrested the person they allege was putting up nooses at this construction site.


The 34 year old is charged with:

1. Mischief Interrupt Property Over $5000.00

2. Three counts of Criminal Harassment
 
Police have arrested the person they allege was putting up nooses at this construction site.


The 34 year old is charged with:

1. Mischief Interrupt Property Over $5000.00

2. Three counts of Criminal Harassment
Glad they caught the scum. This is a prime example of someone who should be blackballed from the entire industry, but im sure he'll be back to work with another company in no time knowing how messed up the construction industry is with ethics.
 
To give some gravity to what went down...

"On June 10, employees called police after two Black construction workers found two nooses at the site on Coxwell Avenue, north of Danforth Avenue."

Source: https://www.cbc.ca/news/canada/toronto/noose-arrest-micheal-garron-hospital-1.5831284

I can't imagine what it's like to work under the conditions knowing another employee is quietly targeting you because of your race and with such violent symbolism. I would be really fearful to work there.
 
Photo update, taken December 8th, 2020.

Most of the change is in the form of glazing getting close to completion, and a large portion of the building having been Blueskinned.

First, a peek from the north, with the existing hospital in front:

1607454904894.png


Now from directly across the street (the west)

1607454980277.png


1607455009860.png


Kitty corner from the south-west, now we can see along Sammon:

1607455056074.png


A slightly closer look at the glazing:

1607455094483.png


1607455126403.png


A broad shot of the Sammon flank alone:

1607455187323.png


Now w/less wiring in the way, directly from the south:

1607455233416.png


1607455273790.png
 
Photos taken May 16th, 2021:

Of note, cladding is going up, both in panel and brick form; and interior fit-out has begun with visible drop ceilings and light fixtures.

1621208237410.png


1621208260629.png


1621208283633.png


1621208304076.png


Brick for the Coxwell frontage and flank:

1621208336175.png


1621208360541.png


1621208377288.png
 
Photos taken June 27th, 2021:

From the east, along the Sammon Frontage:

1624808301381.png


1624808327431.png


Directly from the south, at Coxwell:

1624808359224.png


Looking back towards to the east, from Coxwell, along Sammon:

1624808384070.png


Coxwell frontage, from the south-west and west:

1624808413101.png


1624808429630.png


A peak between the old building and the new, looking at the work to connect the new, to the middle-aged buildings to the east. (old building up front will be demolished)

1624808449483.png
 
I took quite a few today, but the weather made a hash of them with water getting all over my lens! Most of the pics had some adverse effect, but I have selected those w/the least issues.

So just three, taken Dec 25th, 2021:

1640464727220.png


Sidewalk is going in:

1640464765111.png


Lots of lights on, the majority of interior finishing appears to be complete across most levels including paint, fixtures and ceilings, with some exceptions.

1640464846298.png
 