Mississauga Oro at Edge Towers | ?m | 50s | Solmar | Rosario Varacalli

60% is m very low for Mississauga as is.MCC requires 100% for as of right development, which most people do because there isn’t any density restrictions. It’s usually just easier to build the parking than rezone for a lower rate.
 
DJI_0259.JPG
 
July 10
There is more up on site for July 6 & 10
They are placing steel mesh and shot create along Elm Dr wall in place of shoring, as well a small section for the east wall for tower 2. Shoring was only used for Tower 1 on Elm Dr.

As for parking levels, Elm Dr is a slopping road going east with tower 1 having more levels by the looks of things compare to 4 that was to be used. The best tower 1 can get is 5 plus haft a 6 without being above current grade as the east end. The person I need to talk to was off site
50100390428_6a5bf1fc01_b.jpg

50100389348_5a74259e99_b.jpg

50100967136_39949b5319_b.jpg

50101188607_f3bcd79451_b.jpg

50100376038_208ce50c86_b.jpg

50100374608_17d28a2eba_b.jpg

50100371388_e51bc499f6_b.jpg

50099873827_cbd9c8ce99_b.jpg

50099874177_864128c375_b.jpg

50099647606_2782191712_b.jpg
 
July 10
There is more up on site for July 6 & 10
They are placing steel mesh and shot create along Elm Dr wall in place of shoring, as well a small section for the east wall for tower 2. Shoring was only used for Tower 1 on Elm Dr.

As for parking levels, Elm Dr is a slopping road going east with tower 1 having more levels by the looks of things compare to 4 that was to be used. The best tower 1 can get is 5 plus haft a 6 without being above current grade as the east end. The person I need to talk to was off site
50100390428_6a5bf1fc01_b.jpg

50100389348_5a74259e99_b.jpg

50100967136_39949b5319_b.jpg

50101188607_f3bcd79451_b.jpg

50100376038_208ce50c86_b.jpg

50100374608_17d28a2eba_b.jpg

50100371388_e51bc499f6_b.jpg

50099873827_cbd9c8ce99_b.jpg

50099874177_864128c375_b.jpg

50099647606_2782191712_b.jpg
They are using shot crete here.

Both towers are P4.
 
July 25
More up on site.

P5 or what it will be almost complete. At this point until the forming of the next floor, no idea where the ramp will be to get to Elm Dr. I have an idea where it may go, but will wait tell the forming takes place.
50156204527_b853daaa39_b.jpg

50156205157_577a8bdd00_b.jpg

50155975146_d6a7149aae_b.jpg

50156208462_65139c3dd8_b.jpg

50155419898_299c1e4acf_b.jpg

50156209742_dc9ec3e1e7_b.jpg

50155421408_59d6d04c0a_b.jpg

50155978041_6acf29e0f1_b.jpg

50155978431_8502995a8b_b.jpg

50155980141_9106e7eda8_b.jpg

50155980561_2c72d12c0e_b.jpg

50156214197_225f34a7f1_b.jpg

50156215472_0ed87812d8_b.jpg

50155983511_bd6338852c_b.jpg

50155428098_533acd7edd_b.jpg

50156217827_0581c3161d_b.jpg
 
Wow that's pretty good. When do you think the T2 excavation will complete?

Also since the road is going downwards toward T3 will they keep it P5 parking for all 3 buildings? Would they need to raise the height of the base of T2,3 so they P5 would fit?
 
Last edited: