News   Jan 19, 2026
 983     5 
News   Jan 19, 2026
 736     1 
News   Jan 19, 2026
 630     0 

Recent content by tsm1072

  1. T

    Roads: Traffic Signals

    Thanks for the detailed response. Gives me some more background before emailing the city about it. Hamilton has a lot of signal changes going on right now with roads being transitioned to 2-way, LPIs becoming standard, and Cycle tracks with dedicated signals, so I'm sure the transportation...
  2. T

    Roads: Traffic Signals

    I have a traffic signal question related to bike signals. There are 2 locations in Hamilton I've been interested in the logic behind the bike signal timing and whether it can be changed: 1. Bay at King and Bay at Main (https://maps.app.goo.gl/v7xTTRukTtdeGT5g6?g_st=ac) Here the bike signal...
  3. T

    Intercity Bus Services

    Something I noticed on the Hamilton Public works committee agenda this week: looks like Flixbus is planning to serve downtown Hamilton. Service levels should be good as well...
  4. T

    GO Transit: Construction Projects (Metrolinx, various)

    The reason is the ~1000 bi-level coaches GO already owns that have plenty of lifespan left, and the Bi-level coach is a de-facto standard across a few systems in North America. GO is a large enough organization that when they order new equipment they will be ordering in large enough QTYs to...
  5. T

    Alto - High Speed Rail (Toronto-Quebec City)

    An alternative option for the junction could be just committing to more expropriation and a longer viaduct. Expropriate a large chunk of the properties between Midland and the MX corridor to allow for a smooth elevated curve with a 450m radius. That gets you to a point just beside the MX...
  6. T

    GO Transit: Construction Projects (Metrolinx, various)

    I think the scope and type of project is important here. Building a bridge is a very different project compared to replacing bridge spans of an existing structure. If Metrolinx is building a new bridge, with new abutments, then building the abutments to support a 4th span would be important. But...
  7. T

    Alto - High Speed Rail (Toronto-Quebec City)

    What is wrong with the current corridor through west harbour. 1.5km isn't very far and is a reasonable distance for last mile solutions and local transit to cover. The existing corridor has lots of room to expand, follows an extremely straight and flat alignment to Niagara, running through most...
  8. T

    GO Transit: Service thread (including extensions)

    I expect this has to do with CN construction. CN has been doing refurbishment of pretty much all the grade crossings in Hamilton (including Stoney Creek). I hope the refurbishment includes track speed upgrades, but there is no indication that is happening. I'm still trying to determine if it is...
  9. T

    VIA Rail

    It definitely isn't possible with VIA's or Kingston's budget, but you could definitely build two terminating platforms that double as storage tracks at the station. One to the North of platform 1 to the west of the station building, and one to the south of platform 2, to the east of the platform...
  10. T

    GO Transit: Service thread (including extensions)

    I should have clarified that I meant the Georgetown to Kitchener segment, which I believe is Metrolinx owned. Am I mistaken in thinking that?
  11. T

    GO Transit: Service thread (including extensions)

    It has been discussed a bit before, but considering Metrolinx already owns the tracks to Kitchener, and is planning hourly service, buying the tracks that continue on to London, upgrading to a reasonable speed, and running a frequent service to London is probably better done by Metrolinx. They...
  12. T

    Roads: Ontario/GTA Highways Discussion

    I've been thinking about the Skyway and Freeman interchange the the general high level of congestion caused through downtown Burlington during rush hour. I know there is eventual plans to rebuild the full interchange to add capacity, but I feel in the short term more can be done to reduce...
  13. T

    Roads: Ontario/GTA Highways Discussion

    If there is an upload and the province widens the Linc and RHVP, I think the QEW-RHVP interchange (along with Nikola Tesla and Centennial) likely needs a re-design. Not sure what the best configuration would be, but the combination of the low speed loop ramps and required weaving to merge/exit...
  14. T

    Toronto Ontario Line 3 | ?m | ?s | Metrolinx

    I feel like this concern is overstated. From previous memory, there is less than 5 garage entrances through the central part of King, which can be comfortably accommodated through a short one-way single lane section of street to allow access to the garage right-in/right-out. The city won't do...
  15. T

    Waterfront Transit Reset Phase 1 Study

    I know one of the issues with a Cherry St extension is the need to tunnel under the rail berm. But, if the city decided to close Cherry St to traffic and run it as a dedicated Streetcar ROW under the berm, would the existing underpass allow for that? It would definitely be a controversial move...

Back
Top