Forums
New posts
Search forums
What's new
New posts
New profile posts
Latest activity
Members
Current visitors
New profile posts
Search profile posts
Calendar
Log in
Register
What's new
Search
Search
Search titles only
By:
Current visitors
New profile posts
Search profile posts
Menu
Log in
Register
News
Apr 24, 2026
From Timber to Low-Carbon Concrete, Materials Are Driving Sustainable Design
1.5K
0
News
Apr 24, 2026
One Bloor West’s Wrap Coming Down as Crown Work Advances
1.4K
1
News
Apr 24, 2026
40-Storeys Proposed at Future iON Stop in Cambridge
2.9K
6
Members
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
TorontoPotential's latest activity
T
TorontoPotential
reacted to
flonicky's post
in the thread
Toronto
Ontario Line 3 | Metrolinx
with
Like
.
Mar 3, 2026
T
TorontoPotential
reacted to
kotsy's post
in the thread
Toronto
Ontario Line 3 | Metrolinx
with
Like
.
Girders are now installed for the 2nd half of the bridge over Dundas St.
Mar 3, 2026
T
TorontoPotential
replied to the thread
Toronto
8 De Grassi | 21.22m | 6s | Percy Ellis | Brander
.
This looks AWESOME!! Something is afoot - they’re drilling what looks like footings today!!!
Mar 3, 2026
T
TorontoPotential
reacted to
AlbertC's post
in the thread
Toronto
8 De Grassi | 21.22m | 6s | Percy Ellis | Brander
with
Like
.
New docs from May 2023 https://www.toronto.ca/city-government/planning-development/application-details/?id=4301756&pid=706496
Mar 3, 2026
T
TorontoPotential
reacted to
AlbertC's post
in the thread
Toronto
1134 Queen East | ?m | 3s | Lamb Dev Corp | A& Architects
with
Like
.
The Lamb mantra: build the bowling alley units and they will come.
Mar 3, 2026
T
TorontoPotential
reacted to
kotsy's post
in the thread
Toronto
Ontario Line: Leslieville Station | 15m | 2s | Metrolinx | HDR
with
Like
.
Small edit - two GO tracks should be going in that already built space over Queen Street. Doesn't look like it will fit now, but there...
Mar 3, 2026
T
TorontoPotential
replied to the thread
Toronto
Ontario Line: Leslieville Station | 15m | 2s | Metrolinx | HDR
.
Yes more bridge / station will sit above Queen and just to the north and south. The photos of it can be found in this thread in the...
Mar 3, 2026
T
TorontoPotential
reacted to
Smiffy's post
in the thread
Toronto
Ontario Line: Leslieville Station | 15m | 2s | Metrolinx | HDR
with
Love
.
Once again it's time for... SMIFFY'S SLOPPY PHONE DRAWING!!! Red- OL Green- GO But jokes aside, it slightly depends on exactly where...
Mar 3, 2026
T
TorontoPotential
replied to the thread
Toronto
Ontario Line: Leslieville Station | 15m | 2s | Metrolinx | HDR
.
Right. Next you’re going to argue that buildings and footings get built on their own…. My comment is about this specific station given...
Mar 2, 2026
T
TorontoPotential
reacted to
GameOnBrad's post
in the thread
Toronto
Ontario Line 3 | Metrolinx
with
Like
.
This bridge will be very visible from Lake Shore Blvd East and The Don Roadway as well...
Mar 1, 2026
T
TorontoPotential
replied to the thread
Toronto
Ontario Line: Leslieville Station | 15m | 2s | Metrolinx | HDR
.
You obviously don’t live here so zip it. Nobody asked you and with zero sign of ANY presence or ANY update from Mx I am sorry if my...
Feb 27, 2026
T
TorontoPotential
replied to the thread
Toronto
Ontario Line: Leslieville Station | 15m | 2s | Metrolinx | HDR
.
Looks like Mx has abandoned this work site. Dammit, Riverside is going to be under construction right until the end aren’t we? I just...
Feb 27, 2026
T
TorontoPotential
reacted to
Smiffy's post
in the thread
Toronto
Ontario Line: Leslieville Station | 15m | 2s | Metrolinx | HDR
with
Like
.
Today:
Feb 27, 2026
T
TorontoPotential
replied to the thread
Toronto
Ontario Line 3 | Metrolinx
.
That’s what I was thinking…
Feb 26, 2026
T
TorontoPotential
reacted to
kotsy's post
in the thread
Toronto
Ontario Line 3 | Metrolinx
with
Haha
.
This can't be right. They started foundations in the Summer and were forming and pouring walls in September.
Feb 26, 2026
Members
Back
Top