News   Apr 20, 2026
 139     0 
News   Apr 17, 2026
 865     0 
News   Apr 17, 2026
 1.9K     6 

Recent content by Sqazi

  1. S

    Toronto 1159 Bloor Street West | 32.85m | 8s | Fitzrovia | Turner Fleischer

    This building badly needs a mural on the West facing side
  2. S

    Cycling: West Toronto Railpath (City of Toronto, Phase II Proposed)

    So we got the City making the decisions on the design change and paying and Metrolinx executing- the best of both worlds 😀
  3. S

    Cycling: West Toronto Railpath (City of Toronto, Phase II Proposed)

    It is remarkable how the City can spend money to have something look worse than it did before. Some really boneheaded decision making or outright graft. I enjoyed the wooden bridge too and the asphalt looks incredibly ugly.
  4. S

    Dundas West/ Bloor Mobility Hub +interconnected hub network (Metrolinx)

    Hard disagree. Lots of rez and multi rez development east of Dundas where the Bloor street entrance would be a lot more accessible than the Randolph entrance.
  5. S

    Dundas West/ Bloor Mobility Hub +interconnected hub network (Metrolinx)

    It makes no sense to me why they wouldn't connect it to the Bloor entrance. Such a huge design flaw and a huge cost in terms of functionality. Alejandra Bravo, the local city councilor, should be advocating for having it link up to the Bloor entrance too.
  6. S

    Toronto GO Transit: Davenport Diamond Grade Separation | ?m | ?s | Metrolinx

    I did that bike ride this summer, up on Lansdowne then through Earlscourt and Prospect cemetery. It's a beatuiful ride but yes the connection from Lansdowne to Earlscourt needs serious improvement and is a danger for both pedestrians and cyclists. Bridge directly from the Greenway to Earlscourt...
  7. S

    Toronto Forma | 308m | 84s | Great Gulf | Gehry Partners

    Agreed, it is phenomenal how well those two buildings complement each other. This looks like it will turn into an iconic Toronto shot once the building is complete.
  8. S

    Toronto GO Transit: Davenport Diamond Grade Separation | ?m | ?s | Metrolinx

    I am really glad the city is doing this. It would have made no sense to leave that connection unconnected. Small things like this make a huge difference in the daily lives of people living in the area
  9. S

    Toronto Catalyst at 77 Wade | 43.72m | 7s | Seeker Labs | DIALOG

    So what did you hear several months ago? That interested tenants were touring? Because I haven't heard of any lifesciences tenants looking to lease in the Toronto market at all.
  10. S

    Toronto Catalyst at 77 Wade | 43.72m | 7s | Seeker Labs | DIALOG

    If you have any leasing updates please do share. I haven't seen any indication that it's leased, let alone fully leased.
  11. S

    Toronto Catalyst at 77 Wade | 43.72m | 7s | Seeker Labs | DIALOG

    Unfortunately, it very much is
  12. S

    Toronto Catalyst at 77 Wade | 43.72m | 7s | Seeker Labs | DIALOG

    This one feels like it's ground to a halt. I would assume they are keeping this in development to delay how long it sits unleased
  13. S

    Toronto Galleria III | 112.4m | 31s | Almadev | Hariri Pontarini

    There is a pretty cool automotive themed cafe and vintage store right next door. That strip is churning out some very cool retail.
  14. S

    Dundas West/ Bloor Mobility Hub +interconnected hub network (Metrolinx)

    The section of the path from south side of Bloor to Perth that was closed is now open

Back
Top