Apr 20, 2026
Glazed Balconies Improve Building Performance, Resident Comfort, and Long-Term Cost
181
0
News
Apr 20, 2026
News Roundup for April 20, 2026
290
0
News
Apr 20, 2026
Graffiti
348
0
Members
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
smallspy's latest activity
S
smallspy
reacted to
crs1026's post
in the thread
GO Transit: Service thread (including extensions)
with
Like
.
Authority over shortline railways historically was a federal matter, but oversight was delegated over the years from federal to...
Mar 16, 2026
S
smallspy
replied to the thread
TTC: Other Items (catch all)
.
No, they can't. First off, the drivers need to be trained on them. Very few of the drivers at Queensway are, and those are just drivers...
Mar 16, 2026
S
smallspy
replied to the thread
Finch West Line 6 LRT
.
thettctransitfanatic's point about the maintainers is a pretty good one. But keep in mind that the SRT's end time didn't align with the...
Mar 16, 2026
S
smallspy
replied to the thread
Metrolinx: Other Items (catch all)
.
There is no such work on the Bala Sub - yet. At least not for any signalling changes or installations regarding ETCS. All they...
Mar 14, 2026
S
smallspy
reacted to
atakagi1's post
in the thread
Metrolinx: Other Items (catch all)
with
Like
.
Hi everyone, thanks for reading. For those of you who don't have a subscription and would like to read the full article, here's a gift...
Mar 13, 2026
S
smallspy
replied to the thread
Metrolinx: Other Items (catch all)
.
They aren't testing anything - they've only just signed a contract with Alstom to design and provide the system, including all equipment...
Mar 13, 2026
S
smallspy
replied to the thread
GO Transit Fleet Equipment and other
.
It's pretty standard for North American diesel locos to do it this way. On the F59, all of the roof panels come off in large...
Mar 13, 2026
S
smallspy
replied to the thread
Toronto
Ontario Line 3 | Metrolinx
.
The tracks were originally located where the northern platform is currently being built, so they had to move no matter what. But to...
Mar 13, 2026
S
smallspy
replied to the thread
Toronto
Ontario Line 3 | Metrolinx
.
Can you try phrasing your question a bit better, perhaps? Dan
Mar 12, 2026
S
smallspy
replied to the thread
TTC: Streetcar Network
.
That's correct - it has the geometry similar to a double-point switch, so you can see how much longer it is. In fact, as I recall due...
Mar 12, 2026
S
smallspy
replied to the thread
Toronto
Ontario Line 3 | Metrolinx
.
Because they would have had to build the south GO platform and the south half of the underpass first, before moving them then. Dan
Mar 12, 2026
S
smallspy
replied to the thread
Toronto
Ontario Line 3 | Metrolinx
.
The plan was always to come back and build the south/east potion of the overpass and station after the north/west part was completed...
Mar 12, 2026
S
smallspy
replied to the thread
Hamilton-Niagara passenger rail enhancements
.
30mph. Dan
Mar 11, 2026
S
smallspy
replied to the thread
Hamilton-Niagara passenger rail enhancements
.
The biggest issue to the speeds through that section is curvature, not switch size. The curves are just too tight to allow for higher...
Mar 11, 2026
S
smallspy
replied to the thread
GO Transit: Construction Projects (Metrolinx, various)
.
Yes, but only for a couple of years. They had been using the old station at Burlington West - just west of the current station, at the...
Mar 11, 2026