News   Apr 17, 2024
 247     0 
News   Apr 17, 2024
 268     0 
News   Apr 17, 2024
 1.7K     1 

Recent content by SGHA504

  1. SGHA504

    VIA Rail

    Is there a chance the track could bend?
  2. SGHA504

    GO Transit: 50 Possible Sites for new Stations

    Nope, they would both offer service.
  3. SGHA504

    GO Transit: Service thread (including extensions)

    I think that's great, nice refresh. Good job GO!
  4. SGHA504

    GO Transit: Service thread (including extensions)

    Wouldn't Bolton Line ridership be bolstered by the fact the CP Mactier Sub passes through Woodbridge as well? Surely a stop would be put in place somewhere in that community, should the line ever come into existence.
  5. SGHA504

    GO Transit: Construction Projects (Metrolinx, various)

    Just noticed today that the north pedestrian entrance (from Atlantic Ave) has been temporarily diverted. I assume for the tunnel entrance construction. That's the first sign of 5th track construction activity @ GO Exhibition in months.
  6. SGHA504

    GO Transit: Construction Projects (Metrolinx, various)

    Haha meaning they are illogical?
  7. SGHA504

    GO Transit: Union Station Shed Replacement & Track Upgrades (Zeidler)

    There is one maintenance/utility tunnel connecting the south and north MTCC buildings under the tracks, its about wide enough for 2 golf carts to pass through side by side.
  8. SGHA504

    GO Transit: Union Station Shed Replacement & Track Upgrades (Zeidler)

    The VIA 1 lounge was the first project completed as part of this renovation, no? Surely that's a sign they aren't going anywhere.
  9. SGHA504

    GO Transit: Union Station Shed Replacement & Track Upgrades (Zeidler)

    Will the long, outdoor platforms (pictured above) that extend out of the train shed be "touched up" or renovated in any capacity? I know they don't really serve much purpose anymore in terms of passenger loading (aside from The Canadian?) but it would seem a bit off to put all this great effort...
  10. SGHA504

    GO Transit: Construction Projects (Metrolinx, various)

    Totally agree, a pedestrian friendly access network from the east side (where much of the residential foot traffic originates) would be a great improvement, since the station has such a small foot print. Access from Manchester St would be a great start.
  11. SGHA504

    GO Transit: Construction Projects (Metrolinx, various)

    Any chance this will be part of a station renovation/upgrade as well? I'd sure like another entrance...hopefully on the south side...
  12. SGHA504

    GO Transit: Service thread (including extensions)

    Is there a documented timeline for expansion of off-peak Lakeshore service? Surely Union renovations can't be holding it up.
  13. SGHA504

    GO Transit: Union Station Shed Replacement & Track Upgrades (Zeidler)

    There's room for a new stub track 1 if the rear brick wall of the skywalk is renovated and the curve of the track for platform 3 is altered.
  14. SGHA504

    GO Transit: Construction Projects (Metrolinx, various)

    I read somewhere online that the piles being placed in the ground @ Strachan are being augured in, as opposed to the hammering method in the Junction. This was because of the rock bed beneath the ground at Strachan (closer to the lake) was softer and can just be drilled straight into. Should...

Back
Top