News   Apr 22, 2026
 454     0 
News   Apr 22, 2026
 301     1 
News   Apr 22, 2026
 345     0 

Recent content by Matt.R

  1. Matt.R

    Stratford Krug Factory Redevelopment | 35.4m | 10s | Juliana Development | Martin Simmons

    For anyone else who can't see the Instagram link provided by @rdaner (link may be broken or post removed, is what I see), the OLT appeal by CN has been settled. Link to the full article here. Even in a context like Startford, I'm not entriely convinced that the use of the word "tower" is...
  2. Matt.R

    Toronto 85 Corporate Drive | 161.15m | 48s | Northcrest | WZMH

    Ka-boom... even though it seems to be dead. It's the thought that counts?
  3. Matt.R

    Kitchener Friendship Village | ?m | 10s | House of Friendship | Martin Simmons

    Crane came down on February 2nd, which is when these photos are from. Just didn't get around to posting them. Went by last week, and nothing is substantially different from these photos, other than the crane being completely gone. Some crane disassembly in action. As good a photo as I could...
  4. Matt.R

    Kitchener 1001 King Street East | 102.1m | 30s | Vive Development | Neo Architecture

    This is now topped out or very very close. Any additional height from here would come from rooftop mechanical equipment/ the MPH. This shot is from the property that is supposed to become the East Gate development by Zehr. Phase 2 will see the building extend about 70% the length of Phase 1 in...
  5. Matt.R

    Kitchener Stride on Franklin | ?m | 11s | Zehr | ABA

    The crane for this went up yesterday. Well... most of it. Photo from last night: Featuring Elevate Condos in the background. Edit from the next day: the rest of the crane is complete. Wasn't able to get photo evidence unfortunately... apologies.
  6. Matt.R

    Cambridge Cambridge Recreation Complex | ?m | 2s | City of Cambridge | MJMA

    Here's a few more angles from Dec. 24. Coming along nicely. The big parking lot along the future East Boundary Road (McQueen Shaver Blvd linking up to the bottom end of Townline Rd) in the site plan is going to be on the left side of this photo, with the road a bit further left and out of...
  7. Matt.R

    Cambridge 581-595 Langs Drive | 27.7m | 7s | Region of Waterloo | Arcadis

    You beat me to it. I took photos on Dec. 24 then went across the pond before posting them. So here's more because why not:
  8. Matt.R

    Waterloo The Barrel Yards (Phases 3 & 4) | 118.07m | 32s | Auburn | Turner Fleischer

    Not surprised at the overall design, given the precedent set by the earlier towers. But considering they'd be the tallest in the project (and city, if completed today), I think some extra care or pizzazz would be warranted. Even if the towers stay the same, that podium facade on the Phase 4...
  9. Matt.R

    Cambridge 32-38 Grand Avenue South | 88m | 29s | Kiah Group | Neo Architecture

    This one was appealed to the OLT after the City failed to make a decision in time. 'Twas not popular at the public meeting - with both the public and Council. Staff report recommended refusal as well, so should be an interesting battle. This is also the first development to come forward...
  10. Matt.R

    Cambridge Preston Springs Redevelopment | 89.7m | 26s | Haastown | Arch. Unfolded

    This one was approved at the OLT the other day. A couple changes. Building heights reduced from 22, 24, and 26 storeys to 18, 20, and 22 storeys. Unit count reduced from 752 to 635. New site plan: Sorry for the sub-par photo quality. Hoping to go digging for more of the revised/ final/...
  11. Matt.R

    Kitchener The Metz | 127.8m | 38s | Auburn | Turner Fleischer

    Thought this was an interesting perspective. Cranes for the site as seen from Borden Station. I suspect some of the taller buildings will rise a bit higher than the cranes, but it gives a sense of the size and scale this project will have from a distance. Also note the 50 Borden Ave site and...
  12. Matt.R

    Kitchener 900 King Street West | 79.73m | 25s | Cantiro | srm Architects

    Here's an update for this one. Getting very close to completion. From the southwest, between Grand River Hospital and the KWCI campus. A bit closer, on GRH property. From the other side of King St @ Grand River Hospital entrance. Main entrance. King St garage entrance. There's...
  13. Matt.R

    Kitchener 75 Fallowfield Drive | 25m | 8s | Drewlo Holdings

    More from Block Line Station. October 17, 2025.
  14. Matt.R

    Kitchener Station Park | 184.95m | 50s | VanMar Developments | Kirkor

    Not to drag this back from the depths just to rain on the parade, but I found this photo of City Hall under construction (likely 1991/1992) and, lo and behold, a luffing jib tower crane! Not entirely sure why my mind immediately recalled this one post from almost two years ago, but alas here...
  15. Matt.R

    Cambridge 255 King Street West | 61.6m | 16s | Auburn | Edge Architects

    Happened to be in Preston this evening, so stopped and got some photos of the site. This one turned out a bit blurry, but wanted this vantage point for future reference: From the edge of the site along King: From the north edge of the site looking south just up Fountain, King St seen on...