Recent content by jibsta

  1. J

    Toronto One Bloor West | 308.6m | 85s | Tridel | Foster + Partners

    i highly doubt they stop early land is a big budget item, the underground and main level complexity was a big budget item, th higher floors are much simpler construction and every level up is lower average psf.
  2. J

    Toronto One Bloor West | 308.6m | 85s | Tridel | Foster + Partners

    yes this is the floor which has bench seating
  3. J

    Toronto One Bloor West | 308.6m | 85s | Tridel | Foster + Partners

    SO they just poured the 3rd mech?
  4. J

    Toronto One Bloor West | 308.6m | 85s | Tridel | Foster + Partners

    so in theory we should top out in 45 - 50 weeks?
  5. J

    Toronto One Bloor West | 308.6m | 85s | Tridel | Foster + Partners

    no doubt and there are nice buildings we keep for sure! but imagine he didnt demo stolleries, and city voted to keep it, it is aun unremarkable building, and would have handicaped the ever loving shit out of this tower, the fact it was gone and we get this insane high end street facade is a...
  6. J

    Toronto One Bloor West | 308.6m | 85s | Tridel | Foster + Partners

    most heritage is crap and used by nimbies to limit development. this city will call any ugly building heritage and we end up with disgusting monstrosities at ground level. i am happy he quickly got rid of the building so that we could have a 40 foot high uninterrupted street presence which is...
  7. J

    Toronto One Bloor West | 308.6m | 85s | Tridel | Foster + Partners

    so any over under where the bloor sidwalk will open up? guessing once they pass the mech level with the rcs?
  8. J

    Toronto One Bloor West | 308.6m | 85s | Tridel | Foster + Partners

    Yes I understand that but what I don't get is the drawings showing them at random floors
  9. J

    Toronto One Bloor West | 308.6m | 85s | Tridel | Foster + Partners

    so, so far none of the levels above mech -2 have sheer walls
  10. J

    Toronto One Bloor West | 308.6m | 85s | Tridel | Foster + Partners

    i dont get it, they arbitraily have or don't have them on different floors for same types? maybe it is every 6 floors where the corner hangers start have the walls? the marketing floor plans show the sheer walls even in the large suites on high floors
  11. J

    Toronto One Bloor West | 308.6m | 85s | Tridel | Foster + Partners

    did the sheer walls end the same level the columns reduced in size?
  12. J

    Toronto One Bloor West | 308.6m | 85s | Tridel | Foster + Partners

    why have they abandoned finishing the back of the elevator stack
  13. J

    Toronto One Bloor West | 308.6m | 85s | Tridel | Foster + Partners

    with sidewalks poured do we expect the hoarding to pull back soon?
  14. J

    Toronto One Bloor West | 308.6m | 85s | Tridel | Foster + Partners

    HAS THE BACK SIDE of the elevator shaft been half insulated for ever now? do they intend to finish it lol
  15. J

    Toronto One Bloor West | 308.6m | 85s | Tridel | Foster + Partners

    so the last 2 pours, there is no more sheer walls anymore?