News   Oct 21, 2020
 1.3K     1 
News   Oct 21, 2020
 1.1K     1 
News   Oct 21, 2020
 948     0 

Recent content by Haydenpoon

  1. H

    TTC: Sheppard Subway Extension (Proposed)

    Kipling to VMC via Scarborough.
  2. H

    Metrolinx: Other Items (catch all)

    Where did you find the map may I ask?
  3. H

    Intercity Bus Services

    Rural Intercommunity Routes and Intercity Coach Services could be a different colour in my opinion.
  4. H

    York Region Transit: Viva service thread

    https://www.yrt.ca/en/schedules-and-maps/service-changes.aspx Another around of service reduction, including those that just got service increased in September.
  5. H

    Ontario Line (was Relief Line South, in Design)

    Because the structure for the 2 tracks before and after the station does not need to be separated?
  6. H

    Ontario Line (was Relief Line South, in Design)

    The bus terminal is not directly adjacent to Eglinton Avenue(slightly to the north), so maybe there is space for escalators directly from Ontario Line to the concourse. (see the image)
  7. H

    Ontario Line (was Relief Line South, in Design)

    ^They relocated Thorncliffe Park station from the "east" to the "west" end of the street.
  8. H

    Ontario Line (was Relief Line South, in Design)

    A longer escalator directly from the OL platform to Eglinton Crosstown Concourse?
  9. H

    Ontario Line (was Relief Line South, in Design)

    Do not get off at the Science Centre station to go to the Science Centre. Flemingdon Park is way closer.
  10. H

    TTC: Sheppard Subway Extension (Proposed)

    How about both lines serving both stations at Sheppard and STC? That way, those who are heading east on Sheppard as far east as possible (McCowan), those who want to go to STC will not need to transfer, and the line can easily extend east on Ellesmere if needed. The potential for cross-platform...
  11. H

    Metrolinx: Sheppard East LRT (In Design)

    1. Build the Ontario Line to Sheppard (Don Mills Station), 20+years 2. Close the Sheppard Subway 3. Build a new Sheppard Subway from Sheppard West to McCowan with the Ontario Line technology, 30+years
  12. H

    GO Transit: Service thread (including extensions)

    https://www.gotransit.com/en/trip-planning/go-service-updates/train-schedule-changes Stouffville Line Service changes start October 14 Looks like they are adding 3 mins to each trip, shifting the schedule a bit, reducing delays caused by the constructions along the Stouffville Line.
  13. H

    Ontario Line (was Relief Line South, in Design)

    Metrolinx could technically just take the playground.
  14. H

    TTC: Other Items (catch all)

    https://static1.squarespace.com/static/5f31983105399b71d5495df1/t/5f6e1fda0248e16876b9559d/1601052640322/TTC+2021+Annual+Service+Plan+Discussion+Guide.pdf

Top