Recent content by Colin

  1. C

    Toronto River City Condos Phases 1 & 2 | ?m | 16s | Urban Capital | ZAS Architects

    Waterfront Toronto has addressed some of your concerns regarding the woonerfs here
  2. C

    Toronto Sun Life Financial Tower & Harbour Plaza Residences | 236.51m | 67s | Menkes | Sweeny &Co

    You are right, it is pretty tight, however I do believe that the off-ramp will be torn down. Could be wrong though.
  3. C

    Residence College Hotel new Lecture Hall (90 Gerrard St. W, 2s, DSAI)

    I don't think so, unless things have changed. According to the demo company's website they are demolishing the entire building: http://www.aimgroup.ca/case-studies/university-health-network/
  4. C

    Toronto Picasso Condos | 128.62m | 39s | Mattamy Homes | Teeple Architects

    I understand. I believe this is a terminology issue. What you are referring to is called "bored piling". Both "pile driving" and "bored piling" are processes used for shoring during excavation. Anyways, still great to see some activity on the site.
  5. C

    Toronto Picasso Condos | 128.62m | 39s | Mattamy Homes | Teeple Architects

    Okay I'm confused . What is the difference between the two. Isn't a "shoring machine" a pile-driver used for shoring??
  6. C

    Toronto Four Seasons Hotel and Private Residences Toronto | 203.9m | 52s | Lifetime | a—A

    According to the presentation slides for the community meeting ragarding the Bay Street Reno, they are not touching the side walks around "new developments". So I guess the lights are here to stay. I would think that they might take them down during the construction phase though.
  7. C

    Toronto Picasso Condos | 128.62m | 39s | Mattamy Homes | Teeple Architects

    Well not really... This "shoring machine" you speak of is actually a pile-driver.
  8. C

    Toronto Sherbourne Common, Canada's Sugar Beach, and the Water's Edge Promenade | ?m | ?s | Waterfront Toronto | Teeple Architects

    The Downtown waterfront master plan shows that there will be a slip at Jarvis, whether it is built is another issue : http://waterfrontoronto.ca/uploads/documents/cwf_update_meeting___torontos_downtown_waterfront_master_plan_1.pdf Page 15 (Warning Large file) Page 16 of link below shows how...
  9. C

    Toronto Aura at College Park | 271.87m | 78s | Canderel | Graziani + Corazza

    first time posting a pic, can you see them now?
  10. C

    Toronto Aura at College Park | 271.87m | 78s | Canderel | Graziani + Corazza

    Here is the entire block, including the "chicken palace".. pretty interesting stuff Sorry pictures are big, Have no clue how to resize
  11. C

    Toronto Aura at College Park | 271.87m | 78s | Canderel | Graziani + Corazza

    Here is a photo from 1950ish, according to Toronto Archive, of the Aura site. Seems like there was a five story "Bausch & Lomb Optical". I might be wrong though, the archive is kinda hard to follow...
  12. C

    General cycling issues (Is Toronto bike friendly?)

    Miller did a presentation at my school the other day and someone asked about bike lanes on Bloor. He said that they are looking at creating rush-hour only lanes where during the morning the south parking lane will be used only for cyclists travelling into the core, obviously the opposite when...
  13. C

    Toronto Ripley's Aquarium of Canada | 13.11m | 2s | Ripley Entertainment | B+H

    I'm afraid that you have been miss-informed about the benefits of 'white roofs' and furthermore the impacts of the heat island effect. The heat island effect has more to do with air quality, storm water runoff and reductions in heating/cooling then directly reducing global warming and the solar...
  14. C

    1233 Queen East | ?m | 8s

    Relax…..We want the new trains to come as fast as you do, but in reality things don’t always materialize as planned. The main thing is that the new trains will come eventually (a point not being said by these select members you mentioned in the Trump thread), we’ll just have to be patient...:)...
  15. C

    1233 Queen East | ?m | 8s

    A TTC electrical engineer came to do a guest lecture for one of my classes last week about TTC’s energy storage projects. When asked about the new subway cars he gave a timeline very similar to the one mentioned by forum member Agram. The new trains are to arrive in the spring/early summer...