  1. C

    Hamilton The Point | 19.25m | 6s | Yoke Group | Lintack

    This building has already changed the character of the street for the better. I too am hoping that the brick work or brick-like panels look smashing
  2. C

    Hamilton 405 Main Street West | 21.05m | 7s | 3H Properties | RevelHouse

    It is warped but less so then it initially was months back.
  3. C

    Hamilton Trinity Lutheran Church Expansion | ?m | 3s | Invizij

    Temporary construction fencing is now surrounding this property.
  4. C

    Hamilton Coppley Building Redevelopment | ?m | 4s | Core Urban Inc. | Lintack Architects

    This transformation should win project of the year for 2026.
  5. C

    Hamilton TD Coliseum Renovations | ?m | 4s | OVG | BBB

    It's going to be a crazy next week for them to make certain that this project is actually complete and not have workers still building after it actually opens.
  6. C

    Hamilton 405 Main Street West | 21.05m | 7s | 3H Properties | RevelHouse

    They might be having issues with the concrete slabs. They looked heavily bowed, so much so that for a while they placed large concrete blocks on top of them to push them down.
  7. C

    GO Transit: Construction Projects (Metrolinx, various)

    I wonder if passengers at Danforth Station feel the oppressive 'weight' of the new Condo complex beside them. That is one massive street wall.
  8. C

    Roads: Ontario/GTA Highways Discussion

    Mud Street was originally going to be an extension of the LINC but those plans fell off the wheels over two decades ago and now its just a thoroughfare with islands containing dying trees. Hamilton will never have the money to alter this.
  9. C

    Hamilton The Point | 19.25m | 6s | Yoke Group | Lintack

    Same. It looked like they were just finishing demo last week and now there is a crane. I don't even remember them pouring the foundation for the crane but obviously they must have.
  10. C

    Hamilton Scenic Heights | 23.9m | 6s | Elite Developments | Arsenault

    I can't see Elite Developments starting construction on three projects at once but hopefully at least one of these get going sooner then later.
  11. C

    Hamilton Electric Ave | 28.5m | 8s | Elite Developments | srm Architects

    Thanks for posting this render. It looks fine for this part of the city and I hope it gets going quickly.
  12. C

    Hamilton Binkley United Church Redevelopment | 38.4m | 12s | Kindred Works | KPMB

    Main Street West is exactly where a development like this should go, along bus routes, nearby walkable grocery store, local shops, etc.
  13. C

    Hamilton 392 Main Street West | 24.81m | 6s | Lamb Dev Corp | Marenco

    Thanks for posting this. I liked the original proposal but this fits the neighbourhood better. Its probably best that there is no balconies along the Main St W frontage and the brick could look sharp if executed well.
  14. C

    Mississauga Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    It appears that every single project minus the Gardiner rebuild is faced with the same issue, workers not actually working at their site. No wonder these timelines are meaningless as you can't complete something if you are not actually at work.
  15. C

    Hamilton The Design District 41 | ?m | 31s | Emblem Developments | Arcadis

    The supports for the next level of the third tower are already built.