Toronto One Bloor West | 308.6m | 85s | Tridel | Foster + Partners

Looks like they are going to be finishing up the roof on the TMD penthouse in the next few weeks which makes sense seeing as the RCS are nearly at the top I can see this project starting to look like it can see the finish line exterior wise by the end of March
 
IMG_20260111_164901797.jpg
 
Curious what the height of the last habitable floor is? That' how I count my building heights. I don't count spires, antennas and huge mechanical areas. Like the top 243 metres of the Burj is just empty space.
I think this was brought up some time ago, but the elevator goes up to the top floor at 292.275 metres, with a rooftop terrace for the penthouse units at 295.8 metres:
Screenshot 2025-04-08 224535.png
Screenshot 2026-01-12 183321.png
 
They where having their 300 meter party because the tower passed 300 meters. It had nothing to do with their last floor height at the time. And for what that's worth.
 

Back
Top