That's why they should get 6 TBMs to dig for the Crosstown. This cuts down time. Use Cedarvale as the launch site instead so the TBM could both started at the same place for liner delivery and dirt removal. If they dug the launch shafts all at the same time, they could have bored all 3 segments (Black Creek to Cedarvale, Cedarvale to Eglinton and Brentcliffe to Eglinton) at the same time. It'll take about 12 to 15 months to complete, completing in 2013/14. Then they could build each station in 3-4 years time pegging the opening date in 2017/18.That's not always possible as they usually use the completed tunnels to remove the dirt that is excavated by the TBM so having stations being built around that isn't always possible plus you also have the tunnel lining sections being delivered to the TBM as well.
Instead they chose to spread out the cash flow in a decade and place all the digging at 2019/20 (beyond 2 election terms) and it won't complete before the next election. Now this try to make this decade long tunnel first and build later the regular way to build all projects.
Look at the Broadway Subway construction schedule: https://www.broadwaysubway.ca/construction/schedule/ They haven't even started digging and it'll open in 2025.