TTC: McNicoll Bus Garage (Approved)

July 05
Just got around to get the photos I shot of the site up on site and a lot more there than here.

A good chunk of new steel should be up down, with some areas completed by now. A lot of the roof should have more decking on it various areas as well.
42675818935_04bf38012f_b.jpg

42675815675_5a1d03346e_b.jpg

43534141082_954a41be78_b.jpg

43534169552_20c8d9b2ba_b.jpg

28693289887_0a80ec75f5_b.jpg

42863119794_03591ab865_b.jpg

42863124524_f608127eaa_b.jpg

43534062002_ba7dc9d186_b.jpg

43534066062_3cf1b6ceeb_b.jpg

41772808830_63ebaf1b3a_b.jpg

41772811010_5004cb908b_b.jpg

42675785455_3ddc068e55_b.jpg

43534093992_2535e0c576_b.jpg

41772781690_566a470190_b.jpg
 
Oct 30
All the steel work is up and being enclose except at the south end. Forms in place to support the footing for the south columns that will support the roof for the outside storage area along McNicoll.

The north end has precast wall panels up.

Had to wait 25 minutes for a southbound 43 since 5 pass us with close doors. 20 minute gap going north.

Lot more up on site
45669614371_690653d53f_b.jpg

43851517120_aaf2a5f47f_b.jpg

30728986967_48bb7656ae_b.jpg

30729092167_4bf6dba05b_b.jpg

30729096697_fdfdb5da67_b.jpg

30729099377_3e8483cb3e_b.jpg

45669675121_e4fcbb3656_b.jpg

45669682621_234b8e5a8e_b.jpg

45669685771_7922c2b08e_b.jpg

30729125317_e43069e536_b.jpg

31797270678_89be1a8573_b.jpg

43851578590_48cf662c5f_b.jpg

45669625081_928d2fcec2_b.jpg

44755295105_737f37007b_b.jpg

30728970157_a070507f9c_b.jpg
 
Feb 03
Too much snow to get shots.

Steel canopy still missing on the south end
46063038405_10d5f06a87_b.jpg

46924780752_63bc009db2_b.jpg

46063036705_55f15900d8_b.jpg

46924779562_1d7262b3dc_b.jpg

46924772672_03ac3e43f6_b.jpg

46063023185_22c59f5d5d_b.jpg

46924769062_5c59d31b87_b.jpg

46063017635_438975c5b6_b.jpg

46063016705_377b71782e_b.jpg
 
July 08
Work has started on the Employee parking lot.
More up on site
48311994491_f15c3856b8_b.jpg

48311996761_c22fee1cfc_b.jpg

48312112657_07c48af5d6_b.jpg

48311998046_ae07c13b91_b.jpg

48312115912_5d581be0bf_b.jpg

48312006506_49c858c56f_b.jpg

48312119392_9b5905ac3e_b.jpg

48312122547_f560947e11_b.jpg

48312009821_5100c541d3_b.jpg

48312014646_a51aba430e_b.jpg

48311994981_fc5d91d355_b.jpg
 
April 25
Not much left to be done outside other than landscaping, paving the employee parking lot as well the garage outside, clean up and a few gates, otherwise ready to roll. Inside is most likely a different story, but all doors close and no look see. It will be opening shortly.
49825098238_6b8c00ee7b_b.jpg

49825098533_78917f65bb_b.jpg

49827782283_d8975a71ec_b.jpg

49825952602_f26e55b679_b.jpg

49825952987_178fe6575c_b.jpg

49825633921_0448e18557_b.jpg

49825953857_a89c882269_b.jpg

49825634736_7d8da6f916_b.jpg

49825954382_8397d6432d_b.jpg
 
July 1
Very little work to be done on the outside other than the Bus gate at the north end and finishing off a small portion of the employee parking lot.

The just finish the curbs at the main entrance/exit for the lot and needs a base of gravel before asphalting it. When they place the top coat, they will finish the east driveway as well. Other than that, the lot is ready for the employees once they start moving to the new garage.

That a nice sound barrier wall at the south end.

There is grading and clearing taking place to the parking lot and don't think it was used for the building of the garage until I take a look at some old photos for it if I have any.
50069141607_3ccae98f6b_b.jpg

50068328168_6298ce134f_b.jpg

50069141947_cbeffe0aa6_b.jpg

50068883796_9214bf49fa_b.jpg

50068328858_982f4da8de_b.jpg

50068329133_ea99a972f2_b.jpg

50068884686_5838fb2e9b_b.jpg
 
Hopefully, the McNicoll bus garage will open this year. Would have been earlier if there wasn't because of the anti-transit Ford brothers.
Its on schedule to do so with a master sign sheet for it. TTC has done some testing inside already
 
Oct 4
Not Schedule to open this year as plan, but now March 2021.

Buses being store
50420461881_cdd1b91e85_b.jpg
 
Kinda wish they had designed this garage to handle a 100% electric fleet. Would have been a great opportunity.

When they haven't even selected a manufacturer or charging technology/standard yet? No, it would have been a huge mistake and may have tied them down to the wrong company or technology.

Dan
 