Toronto The Well | 174.03m | 46s | RioCan | Hariri Pontarini

Screenshot_20200731-235847_Drive.jpg

South face. Since this is curtain wall I'd assume it's shadow boxed spandrel and at least not the disgusting variety of it we usually see

Screenshot_20200801-000125_Drive.jpg

East face will have spandrel for sure, but doesn't look like it'll be egregious
 
Pouring a section of the below grade transfer slab along the north side of The Well site. Several more concrete trucks along the street, not within the frame of this photo. The third concrete pump truck that arrived around 6 this morning was parked on Front Street, not active when these photos were taken.

20200805_115812.jpg


20200805_115337.jpg
 
Forget gold and Shopify... don't know the profit margins, but think we all should have invested in Rebar Manufacture LLC.

^ wow pics as always Red Mars, thx.
 

Back
Top