I've always pictured a subway extension to Square One running along the Milton GO corridor on the surface to save costs over such a long distance. Something like:
Cloverdale
Sherway
Dixie (At rail corridor)
Cawthra (at rail corridor)
Cooksville (at GO Station)
Central Parkway / Elm (at Kariya)
Burnhamthorpe (at Kariya)
Square One
Perhaps it could be split into two phases, the first one as a small extension to Sherway. That type of alignment would make it so the 12km would have maybe 5km tunneled and 7km above grade.
The main problem with this would be that travel times would be getting pretty extreme to get downtown. It's already almost 30 minutes to get from Kipling to Bloor-Yonge, plus the new line would add another 18-19 minutes of travel time. Going from Square One to downtown would probably still take an hour on the subway.
Cloverdale
Sherway
Dixie (At rail corridor)
Cawthra (at rail corridor)
Cooksville (at GO Station)
Central Parkway / Elm (at Kariya)
Burnhamthorpe (at Kariya)
Square One
Perhaps it could be split into two phases, the first one as a small extension to Sherway. That type of alignment would make it so the 12km would have maybe 5km tunneled and 7km above grade.
The main problem with this would be that travel times would be getting pretty extreme to get downtown. It's already almost 30 minutes to get from Kipling to Bloor-Yonge, plus the new line would add another 18-19 minutes of travel time. Going from Square One to downtown would probably still take an hour on the subway.