Toronto Islington Terrace | 145.08m | 45s | Tridel | Kirkor Architects

November 25th, 2018.

KEZ_2602.jpg
 
April 17
The 3rd crane was in the process of being install when I was by the site today. They were installing the cab and took some shots of it being place as well the whole project. Will post when I get them tag this weekend.
 

Back
Top