Crosstown West won't begin construction until at least 2021.
Good thing is that it'll be under construction before Tory completes his presumable second term. Bad thing is that we have to wait at least 4.5 years.
Crosstown West won't begin construction until at least 2021.
Yipee! They're cutting the useless Renforth Drive (not to be confused with Renforth Gateway), Rangoon and Russell/Eden Valley stops. I would have kept the East Mall though. Now if only Lloyd Manor, Wincott and Mulham would get the axe; then we'd have a true subwaylike service on Eglinton West.
...if the line operated on a request-stop basis (and the vehicle only stopped if a rider wanted to get on or off). A request-stop service is preferred. If a request-stop operation is not possible on the LRT, the TTC will explore options for rerouting a local bus route to maintain adequate transit coverage for this community.
"Until AT LEAST 2021" I know everyone wants to point the faults out of TC but the thing is that two of the lines would have been done by now. Of course the Liberal government has a part to play allowing the flip flopping but also by giving the money out in chunks instead of a lump sum. However this is becoming increasingly frustrating especially when we see all the new lines having their own design problems as well. Essentially there is no perfect plan but can we just get to building already instead of lying to ourselves that if we study these things longer that sooner or later we will come up with a plan that has 100% consensus.Good thing is that it'll be under construction before Tory completes his presumable second term. Bad thing is that we have to wait at least 4.5 years.
I hope "Eglinton Flats" includes Scarlet. The above list includes every other intersection along the route and it would be a real joke if they grade-separated all but 1 intersection.
It does.
And it's unlikely that all 5 will be grade separated; only the ones that would introduce significant delay.
IF city of Toronto is willing to pay for it as Onatrio has no interest in funding it. What we are hearing is: sure TO, if you want it we'll let you add the extension to our line. The rest is for you to figure out.Good thing is that it'll be under construction before Tory completes his presumable second term. Bad thing is that we have to wait at least 4.5 years.
Unless TO pays for that too. It's a few billion dollars and would never be worth it over the 30 year span.If Toronto now has to pay for operational costs then all the more reason to elevate the DM to Kennedy section so the trains can be run automatically.
The statement of the mayor Mississauga on providing funding for Crosstown West:
"While we support...regionally-integrated transit...have to make sure that there is a business case to support Mississauga’s participation"
Parking lots are way cheaper! Just not a good solution for long term development.If the GTAA does not contribute to the construction north of the Renforth Gateway to Pearson Airport, they'll need to build more parking garages (plural) for workers, passengers, visitors, etc..
I question the claim that eliminating Widdicombe, Wincott and Mulham stations would make it any more 'subway-like' than with it. How much benefit would that provide compared to the cost of running bus service on Eglinton West to serve those stops?Yipee! They're cutting the useless Renforth Drive (not to be confused with Renforth Gateway), Rangoon and Russell/Eden Valley stops. I would have kept the East Mall though. Now if only Lloyd Manor, Wincott and Mulham would get the axe; then we'd have a true subwaylike service on Eglinton West.
You know there is a plan to build a 10 story retirement home right there.Wincott is currently the most useless stop out of the revised plan. In fact it was still the most useless stop even before they revised the plan. Widdicombe is just barely justifiable due to potential future development that may occur.