Highland Creek Treatment Plant Contract 2 Project
|
Highland Creek Treatment Plant Contract 2 Project: The construction of the new Northeast (NE) Plant, a 110 ML/d conventional activated sludge treatment plant, a new high-voltage substation, modifications to the Southwest (SW) and Northwest (NW) Plants that will provide long-term rehabilitation, and site preparatory work associated with the long-term plan for the Southeast (SE) Plant.
Address
51 Beechgrove Dr, Toronto, Ontario, M1E 3Z3
Category
Commercial (Industrial)
Status
Under Construction
Number of Buildings
11
Height
33 ft / 10.03 m, 31 ft / 9.60 m, 31 ft / 9.40 m, 23 ft / 7.00 m, 21 ft / 6.51 m, 19 ft / 5.90 m, 19 ft / 5.80 m, 19 ft / 5.65 m, 17 ft / 5.30 m, 16 ft / 4.90 m, 15 ft / 4.70 m
Storeys
2, 2, 2, 2, 2, 2, 2, 2, 2, 2, 2
Developer
City of Toronto
Architect
CH2M HILL Canada Limited
Site Services
Metroworks Property Survey Section
Forum
Buildings Discussion | |
Views: 1.1K | Replies: 3 | Last Post: Feb 04, 2024 |
Member Photos
5 photos |
News