Napoleon
Active Member
I do definitely applaud the city for doing more of these things at once. Far better than digging up the street, putting it back, and then digging it up again a year later. It does increase the complexity of projects though, which means more time and more coordination is necessary. I wonder if that might have played some role in the Billy Bishop tunnel delays.Definitely shouldn't all be considered an "overrun". The City is trying (trying!) to coordinate infrastructure rehab / replacement to all happen simultaneously wherever possible - so this particular one aligned with goals of sewer / WM replacement as well as other works. With luck, it will be followed by a construction moratorium on Leslie of at least 5 years.