Toronto 2 St Thomas | 80.46m | 26s | KingSett Capital | Hariri Pontarini

March 19
Footing in place for the 2nd tower
25926016786_c4f3e037cc_b.jpg

25831137262_4aa3ed73c8_b.jpg

25323204733_0deae49894_b.jpg

25856975981_d8151263a4_b.jpg

25951935575_d2ae2428bb_b.jpg

25951957955_dd19a61fbf_b.jpg
 
And then three weeks later…

DSC00707.jpg
DSC00710.jpg

One more storey done at the north end of the pit.

42
 

Attachments

  • DSC00707.jpg
    DSC00707.jpg
    413.5 KB · Views: 2,234
  • DSC00710.jpg
    DSC00710.jpg
    363.1 KB · Views: 2,184
Well, it looks like that "Tree Protection Zone" has failed. Someone should get in trouble for that. Those were nice trees, and I loved to walk past when the second "University Apartments" building was still standing.
 
That's unfortunate. London Plane are great looking trees,. Don't see anything wrong with the TPZ.
 
That's unfortunate. London Plane are great looking trees,. Don't see anything wrong with the TPZ.
Looking at the photos, I think Construction Gate 1 was probably a little bit close to the tree, and all the traffic would have affected the root system. I think the TPZ should have extended a bit further on that end. I wonder what TPZ size/distance requirements are set at.

Side note: How many construction gates are typical for a site?! The photos above show three, all in very close proximity to each other.
 
Some siding has arrived on site. It looks like about a 1"-2"thick stone laid onto concrete slabs. It looked like what was used on the Florian condo except with stone instead of "brick". Hard to tell if the stone was real or not. I couldn't get close enough.
 