Toronto SQ Spadina Queen Condos at Alexandra Park | 43.89m | 14s | Tridel | Teeple Architects

SQ from the 24th:

DSC01610.jpg
DSC01611.jpg
DSC01612.jpg
DSC01613.jpg
DSC01614.jpg
DSC01615.jpg
DSC01616.jpg


42
 

Attachments

  • DSC01610.jpg
    DSC01610.jpg
    309 KB · Views: 1,543
  • DSC01611.jpg
    DSC01611.jpg
    314.5 KB · Views: 1,593
  • DSC01612.jpg
    DSC01612.jpg
    258 KB · Views: 1,547
  • DSC01613.jpg
    DSC01613.jpg
    314.1 KB · Views: 1,529
  • DSC01614.jpg
    DSC01614.jpg
    220.3 KB · Views: 1,530
  • DSC01615.jpg
    DSC01615.jpg
    349.9 KB · Views: 1,531
  • DSC01616.jpg
    DSC01616.jpg
    385.5 KB · Views: 1,568
Very much liking the residential density with this townhouse row. Should be something we aspire towards in many of our residential downtown streets.
 
Picture 5.png


Picture captured by webcam on Wednesday, May 18th. The view is the west side of SQ (which is the back of the building) The construction team at SQ has finished pouring concrete on all 14 floors. Window installations have started on the 4th floor and rough-in work for electrical and plumbing is on the 6th floor.
 

Attachments

  • Picture 5.png
    Picture 5.png
    756.5 KB · Views: 1,054
I don't think the metal paneling @ SQ is spandrel :)

Yeah, maybe. We're stretching the term these days in Toronto. I still like these sandwich panels as an alternative to the spandrel glass towers we're seeing from Tridel.
 
Picture 4.png

Picture captured by webcam on Wednesday, June 15th. The view is the west side of SQ (which is the back of the building) The construction team at SQ has finished pouring concrete on all 14 floors. Window installations have started on the 6th floor.

Tridel on May 1st wrote:
"Please note that on May 1st, 2016 we experienced an interruption to our scheduled construction work as a result of unionized trade negotiations. The majority of our trades have successfully completed new collective agreements; however a few have not (drywall and tile installers) and have gone on strike. At this time, the delay to the construction activity as a result of the strike is estimated to be approximately 45 days."
 

Attachments

  • Picture 4.png
    Picture 4.png
    766.9 KB · Views: 644
Gotta say I am not a fan of the wall of townhouses. Maybe when done they will pop more, plant some trees maybe. More colour/ contrast would do a lot of good here. Maybe its the angle of the cam but that the roof of the houses is just so monotonous.
 
Gotta say I am not a fan of the wall of townhouses. Maybe when done they will pop more, plant some trees maybe. More colour/ contrast would do a lot of good here. Maybe its the angle of the cam but that the roof of the houses is just so monotonous.

Got to walk on the street to get a sense - it is probably going to be fine, esp. for an internal street.