Toronto Pinnacle One Yonge | 345.5m | 105s | Pinnacle | Hariri Pontarini

Thursday morning.
IMG_1302.jpeg


IMG_1303.jpeg


IMG_1301.jpeg
 
Process of installing a window:
Windows waiting to be installed.
IMG_3718.jpeg

Window being lifted.
IMG_3719.jpeg
IMG_3720.jpeg
IMG_3721.jpeg

Almost done
IMG_3722.jpeg

Installed.
IMG_3723.jpeg

Some windows have been re-installed on the 7th floor correctly. Still have to fix some windows on the 8th floor.
IMG_3724.jpeg

Current progress of the whole tower.
IMG_3725.jpeg
 

Back
Top