tripwire
Active Member
Has this building closed? Or have residents been stuck paying occupancy rent this whole time?
Has this building closed? Or have residents been stuck paying occupancy rent this whole time?
They have a Board so it closed, quite a while ago. Presumably the lack of the BMU means that their windows have yet to be cleaned for the first time.Has this building closed? Or have residents been stuck paying occupancy rent this whole time?
completion of final stages of construction
It's now fall. Anyone know of any updates on this?They are even saying the derrick crane will be removed by end of summer.
november nowIt's now fall. Anyone know of any updates on this?
Presumably they did not say 2017! What a bunch of total incompetents!november now
November 2031november now
...... and at least one missing panel of the glass on the 'overhang' on Yonge and the final repair of The Esplanade and the putting back the streetlights and ......November 2031
When the crane is removed, I wonder if they will also fix all the missing/damaged exterior glass panels? There are a handful of missing balconies still....
They are waiting for the developer of L-Tower and Backstage to sort out the street lighting with Hydro and only THEN can they do the south sidewalk and the paving. Taking a long time? Well, it's Cityzen!Is the City planning on repaving The Esplanade between the L Tower and Backstage? It's brutal.
We need the YEAR clearly specified when discussing this building (or developer!) What a group of incompetents!https://www.bloomberg.com/news/arti...-toronto-nabs-award-even-with-crane-left-atop
not sure if it's been posted here before, but saw an article in bloomberg today about the derrick still on top of the building... apparently it's coming down in February!