Lots happening today. The basement and ground floor slab has been poured and hehind the heritage house and they are beginning to work on creating the basement level of the heritage building. As well giant post-tensioned beams will be lain above the subway tunnel to support the courtyard above. Talked to Ellen Valter, project lead, who said that the steel should start going up in the next quarter. In addition the jumbo glass, which was fabricated in Spain, is already waiting in Brampton for installation. The glass is impressive in that it is triple-glazed and will have no visible joints! The resulting space will be amazing! Finally the picture with the grey panels is where a grey water recycling system is going.
Little update. So it looks like the concrete pour for the basement level and walls is complete. Btw there is work on the Tartu Tower to increase accessibility and unit renovation. No alterations planned on the exterior. Taken 21April.