Toronto Daniels Waterfront - City of the Arts | 156.05m | 45s | Daniels | RAW Design

It seems like they've done 1 level of parking in the last month in the residential towers.

The East Tower is supposed to start occupying Fall 2019, and the West Tower is supposed to be before that. Given the progress so far, do you guys think that's likely?
 
Andreas here from Artscape. We have started our fit-out construction with the polishing of the concrete floor and the framing of the walls. First photo is of our event space/class room area, which is facing the lake.
IMG_8053.JPG


This is the view of the office area (north). No framing in this area yet, but the layout has been marked down on the floor (orange lines).
IMG_8059.JPG


This is the large meeting room (looking North).
IMG_8077.JPG


This is a view of the corridor where we will offer various collaboration spaces. The event space/class rooms will be to the right.
IMG_8078.JPG


A view North along the main corridor (dubbed the "spine").
IMG_8086.JPG


This is the view of our entrance/lobby area. The openings in the ceiling are skylights, bringing natural light into the lobby space.
IMG_8089.JPG
 

Attachments

  • IMG_8053.JPG
    IMG_8053.JPG
    865.9 KB · Views: 421
  • IMG_8059.JPG
    IMG_8059.JPG
    805 KB · Views: 416
  • IMG_8077.JPG
    IMG_8077.JPG
    863.5 KB · Views: 423
  • IMG_8078.JPG
    IMG_8078.JPG
    825.8 KB · Views: 426
  • IMG_8086.JPG
    IMG_8086.JPG
    802.4 KB · Views: 440
  • IMG_8089.JPG
    IMG_8089.JPG
    868.6 KB · Views: 403
Last edited by a moderator:
Oct 27
Lot more up on site
37291413764_fbc5833c2d_b.jpg

37969921932_3f99bea2c1_b.jpg

38000472501_f539d4f329_b.jpg

38000466801_a685241483_b.jpg

38000455341_5f887c61b2_b.jpg

24148670388_4bed5490fa_b.jpg

24148665048_ae3dba2ab2_b.jpg

24148656568_ae8f3d8d57_b.jpg

37969892152_b6fe74386c_b.jpg

24148652308_e3e2bdf6cf_b.jpg

37969873942_0594663474_b.jpg

26224345189_cfcf702ab8_b.jpg

37291329074_65d13d12a2_b.jpg

37291449904_8dc73af9dc_b.jpg

24148707938_10f4e0d4d9_b.jpg

37969976752_fb95dd5000_b.jpg
 
Does anyone know when occupancy in the office tower is slated to begin? I've heard Spring/Summer 2018...is that still what they're aiming for?
 

Back
Top