Toronto 365 Church Condos | 102.1m | 31s | Menkes | Wallman Architects

This evening.
image.jpeg
image.jpeg
 

Attachments

  • image.jpeg
    image.jpeg
    794.4 KB · Views: 2,074
  • image.jpeg
    image.jpeg
    822.1 KB · Views: 2,071
Those i-beams for the staging area on the north side? Wow! I wonder how far back they go into the building. They probably have to be both very long, resting on the slab, and probably also "clamped" down from the floor above, plus there's also all that extra shoring underneath them. Quite the engineering solution for dealing with a tight construction site!

42
 
There's cladding up on the podium now, facing Church. I saw it last night but it was too dark to really make any detail out
 

Back
Top