Toronto 128 Hazelton Avenue | 37.9m | 9s | Mizrahi Developments | AUDAX

Today.
IMG_6778.JPG
IMG_6779.JPG
IMG_6780.JPG
 

Attachments

  • IMG_6778.JPG
    IMG_6778.JPG
    985.1 KB · Views: 729
  • IMG_6779.JPG
    IMG_6779.JPG
    962.1 KB · Views: 699
  • IMG_6780.JPG
    IMG_6780.JPG
    794.2 KB · Views: 681
Using that same awesome shipping container hoarding we saw recently outside the building on the southeast corner of MacDonald Block.
 
Using that same awesome shipping container hoarding we saw recently outside the building on the southeast corner of MacDonald Block.
Some are on site for The One as well. A real good idea and better than what is currently been use these days. Fast to install as well being remove, but requires a storage area and shipping cost.
 

Attachments

  • 26Hazelton.jpg
    26Hazelton.jpg
    233.2 KB · Views: 337
  • 18967-63897.jpeg
    18967-63897.jpeg
    71.8 KB · Views: 510
  • Screen Shot 2018-06-12 at 9.57.19 AM.png
    Screen Shot 2018-06-12 at 9.57.19 AM.png
    465.2 KB · Views: 543

Back
Top