If I'm not mistaken I read recently somewhere that the people from Zaza are behind this piano bar place.
If I'm not mistaken I read recently somewhere that the people from Zaza are behind this piano bar place.
New Latin American resto opening up in the old Cheval space on King W, called Valdez:
http://www.thegridto.com/blog-post/f...valdez-cheval/
No doubt this place will be a hotspot when it opens
Dineen Coffee Co. opens in the Dineen Building: http://www.blogto.com/cafes/dineen-coffee-co-toronto
This is the southeast corner of Danny & Broadview.
Application: Sign Permit Status: Not Started
Location: 757 BROADVIEW AVE
TORONTO ON M4K 2P6
Ward 30: Toronto-Danforth
Application#: 13 168156 SGN 00 SP Accepted Date: May 14, 2013
Project: First Party New
Description: To erect and display six wall signs, three of which are illuminated, and one illuminated projecting sign. Signs are on the northerly and easterly elevations of first storey, and in conjunction with a restaurant. **Tim Hortons**
This is more of a bar but it looks interesting.
http://www.thestar.com/entertainment...e_june_15.html
Sound Academy (located at The Docks) gets a new Cabana Pool Bar. (a 50,000 square foot summer attraction)
Last edited by Torontovibe; 2013-May-15 at 00:43.
It *is* hideous and ghastly, but it's more than that. It mars what is arguably the most important heritage building on the Danforth. Playter Hall was one of the first major commercial buildings constructed on the strip, completed a decade before the viaduct, and it's a neighbourhood landmark for those travelling east across the Don. To build an additional storey out of cinder blocks, with steel girders stick out of the roof, is more than just bad, it's ... well, there is a special spot in hell for the person who allowed that addition to happen.
This is on the southeast corner of Bloor & Ossington
Application: Building Additions/Alterations Status: Not Started
Location: 883 BLOOR ST W
TORONTO M6G 1M4
Ward 19: Trinity-Spadina
Application#: 13 169033 BLD 00 BA Accepted Date: May 15, 2013
Project: Multiple Unit Building Multiple Projects
Description: Proposal for shell improvements (alteration/repair of existing roof, cladding and addition of HVAC rooftop units) and interior demolition on ground floor in anticipation of a new MacDonalds fast food restaurant on the ground floor of existing two-storey building.
Bookmarks