The model remains in the sales office however, despite the switch to The Cove site now though. I wonder if purchasers in Waterways were given the option to switch to The Cove if they wanted their suite sooner?
Ground breaking for Cove at Waterways will be on Saturday, July 25 at 11 AM to 2 PM.
42