androiduk
Senior Member
Application: Zoning Review Status: Not Started
Location: 2 KING ST W
TORONTO M5H 1C3
Ward 28: Toronto Centre-Rosedale
Application#: 13 120306 ZPR 00 ZR Accepted Date: Feb 14, 2013
Project: Non-Residential Building Other Proposal
Description: Proposal to alter the existing 20-storey commercial office building by: 1) remove existing sloped glass canopy at south face and provide new slab in-fill at Podium roof and 3rd floor; 2) Add approx. 26.7 SM (287 SF) of new roof in-fill at the Podium in former canopy location; 3) Add approx. 32.5 SM (350 SF) of new floor slab in-fill on the 3rd floor in former canopy location; 4) Expand the existing commercial retail space at east side on the ground floor by approx. 48.3 SM (525 SF); 5) Reclad South and East Face of the Tower with new insulated curtainwall glass and glass spandrel system; 6) Reclad portion of North and West face of the Tower with new insulated curtainwall wired glass and glass spandrel system; 7) Reclad remaining portion of North and West face of the Tower with new double glazed, wired-glass window system; 8) Replace existing curtainwall system at Podium with new curtainwall system
Location: 2 KING ST W
TORONTO M5H 1C3
Ward 28: Toronto Centre-Rosedale
Application#: 13 120306 ZPR 00 ZR Accepted Date: Feb 14, 2013
Project: Non-Residential Building Other Proposal
Description: Proposal to alter the existing 20-storey commercial office building by: 1) remove existing sloped glass canopy at south face and provide new slab in-fill at Podium roof and 3rd floor; 2) Add approx. 26.7 SM (287 SF) of new roof in-fill at the Podium in former canopy location; 3) Add approx. 32.5 SM (350 SF) of new floor slab in-fill on the 3rd floor in former canopy location; 4) Expand the existing commercial retail space at east side on the ground floor by approx. 48.3 SM (525 SF); 5) Reclad South and East Face of the Tower with new insulated curtainwall glass and glass spandrel system; 6) Reclad portion of North and West face of the Tower with new insulated curtainwall wired glass and glass spandrel system; 7) Reclad remaining portion of North and West face of the Tower with new double glazed, wired-glass window system; 8) Replace existing curtainwall system at Podium with new curtainwall system