News   Apr 26, 2024
 2.3K     4 
News   Apr 26, 2024
 531     0 
News   Apr 26, 2024
 1.1K     1 

Search results

  1. W

    GO Transit: Construction Projects (Metrolinx, various)

    Yep, that’s how it will be done. Likely shift the track as far west as possible without reducing the track speed below what is operationally acceptable, then a centre shoring wall with the east trench dug first. Memories of the West Toronto Diamond staging...
  2. W

    Jasonzed's myDrone Activity of Toronto and Area

    Cheers...no doubt you already have lots of ideas and requests :) Those pics of the islands are some of the best yet, btw.
  3. W

    Jasonzed's myDrone Activity of Toronto and Area

    Amazing pics! Any chance you are able to gather more of the Georgetown South rail corridor, similar to the ones you have showing the Strachan grade separation? Lots of cool construction going on at the moment in that corridor...
  4. W

    Westwood Condominiums (Alterra) - Real Estate -

    I'm waiting for occupancy on the top floor, as well. My date was pushed from July 24th to August 15th....I suspect Alterra is in default of the minimum notice for a change in occupancy date. We should both be sure to pursue any compensation that is owing!
  5. W

    Drain location arrows

    What I have noticed is they point in the direction of flow, too.
  6. W

    GO Transit: Construction Projects (Metrolinx, various)

    You are correct, this is for the third track between Guildwood and Durham Junction.
  7. W

    Toronto Ontario Line 3 | ?m | ?s

    Agreed. If one looks at the Georgetown South EPR, it shows an 8 track cross-section from USRC to Lansdowne with no room to spare - 2 Milton tracks for all day two-way service, 2 Barrie tracks for all day two-way service, and 4 Kitchener tracks for all day two-way service, VIA, and UP Express...
  8. W

    Roads: Ontario/GTA Highways Discussion

    I can't say for sure and I don't have any pictures of it, but on a recent trip to Pittsburgh I swore I saw that the I279 north of the city had lanes that could be reversed depending on traffic flow demand.
  9. W

    The CityRail Concept: Real Regional Rail for the GTA

    http://www.thestar.com/business/article/1227853--cp-rail-to-close-etobicoke-terminal-eliminating-30-jobs Eliminating the CP yard at Kipling on the Galt Subdivision is just the first of many moves we'll see Hunter Harrison make to make this railway more 'efficient'. Harrison is more interested...
  10. W

    OneCity Plan

    Well said and agreed 100%. The job of our local politicians should be to secure the funding and develop the financing structure, while leaving the designs to the technical folks. As you said, the line drawing is a lot more fun but it doesn't fall within their bailiwick.
  11. W

    Westwood Condominiums (Alterra) - Real Estate -

    It's just the beginning, but so far Alterra is generally keeping their construction schedule with the upcoming ground breaking. We'll see how they do with a new build compared to the Network Lofts conversion.
  12. W

    Pizza!

    +1 for Marcello's but i've only been to the location on St. Clair. The pizza is very good!
  13. W

    Toronto Westwood Condominiums | ?m | 6s | Alterra | Richmond Architects

    Alterra is saying they will be breaking ground this June.
  14. W

    GO Transit: Service thread (including extensions)

    This has been pointed out before I believe, but the Stouffville line is a really tricky one for a quick increase in service, due to the large number of complicated grade separations that would be required. If you follow the line on Google, it's amazing how many major roads it crosses at grade...
  15. W

    Toronto Union Pearson Express | ?m | ?s | Metrolinx | MMM Group Limited

    That's the downstream shaft for the tunneled sewer that has to be lowered due to the lowering of the rail corridor.
  16. W

    Why is Eastern Ave/Front St. SUCH a disaster and when will it be fixed??

    This depends on which entity takes on the role of Constructor per the labour code. If the City was the Constructor, they could allow more than one contractor on the same project, but if the general contractor is the Constructor, they have full control over the project limits. My guess is that...
  17. W

    GO Transit: Construction Projects (Metrolinx, various)

    The work east of Islington is for the rail corridor expansion and I think the bridge in the pictures above is Humber River. The traffic circle work on Resources Rd. and the additional construction work seen north of the rail corridor is not for a new Etobicoke North Station, but being done by...
  18. W

    GO Transit: Service thread (including extensions)

    To place a station north-west of King Street, properties adjacent to the corridor would be required, in one of the densest areas of the city. This would cause spill-out onto Sudbury St. to the east and/or the new residential development and Joe Shuster Way to the west. The City also wants to...
  19. W

    GO Transit: Service thread (including extensions)

    After reading Bruce McQuaig's comment that a refund might only be available to Presto users, perhaps it's a combined effort to ensure riders sign up!
  20. W

    How busy are the Richmond Hill GO line's tracks?

    There used to be the connecting track you mentioned between Denison and Lawrence, but it has since been removed. Even if it still existed, the connecting track wasn't signalized or part of the remotely controlled dispatch for both railways. This would involve a VIA crew to come to a complete...

Back
Top