  1. The article discusses the same concerns I have in...

    The article discusses the same concerns I have in terms of how the final cost is unlikely to actually come to $12 billion..
  2. the big move costs tend to overstate the costs....

    the big move costs tend to overstate the costs. the Dundas BRT is supposed to cost $466 million but they have $600 million "budgeted", the DRL south of Bloor is supposed to be around $6 billion but...
  3. the $4.9 billion included big ticket peak service...

    the $4.9 billion included big ticket peak service expansion, a ton of the money was going to be spent on new yards and trains.

    Metrolinx did a costing of AD2W service to Milton, Barrie,...
  4. that was scrapped ages ago. the corners were only...

    that was scrapped ages ago. the corners were only in the preliminary design circa 2009 from my understanding. when they got a tenant and went into detailed design they were removed.
  5. During the Metrolinx meeting today McCuaig said...

    During the Metrolinx meeting today McCuaig said that electrification would cost $10 - $12 billion (rough estimate, actual costs to come by September).

    I don't see that at all. Given all day 2 way...
  6. Probably work on the USRC that effects all...

    Probably work on the USRC that effects all corridors as all corridors use the tracks.
  7. $0.25 a spot was for every non residential spot...

    $0.25 a spot was for every non residential spot in the GTA, whether that be downtown parking garages or the unused back lot at some vaughan Wal Mart.

    It also had legal issues with municipalities...
  8. Depends. Transit differs from car based...

    Depends.

    Transit differs from car based transportation because as use increases average speed doesn't change, average speed actually tends to increase due to increased frequencies. This means...
  9. Replies
    1,353
    Views
    151,835

    yes, I guess the Liberals will be able to do that...

    yes, I guess the Liberals will be able to do that now. The NDP disputed it last year and didn't let it through. all HOV lanes in the city will be upgraded to HOT from my understanding. Expect the...
  10. Replies
    1,353
    Views
    151,835

    401 - 407 is being widened from 7 lanes (4...

    401 - 407 is being widened from 7 lanes (4 northbound, 3 southbound) to 8 + 2 HOV, 407 to Queen Street is being widened from 6 lanes to 8 + 2 HOV. overall throughput onto the 401 is only going to...
  11. Replies
    2,555
    Views
    284,937

    TVMs only take a week or two to install, they...

    TVMs only take a week or two to install, they will likely start them in early august, if they start them at all.

    PRESTO also won't be on the streetcars until November.

    I don't like autoload,...
  12. Replies
    2,555
    Views
    284,937

    PRESTO cards will only be able to be purchased at...

    PRESTO cards will only be able to be purchased at subway stations from my understanding.

    TVMs will be used for ticket sales outside of PRESTO, which will have its own machine for reloading.
    ...
  13. Replies
    332
    Views
    65,780

    In other news, pile drivers are on site for the...

    In other news, pile drivers are on site for the Marriott, looks like construction is starting.
  14. North-east corner of Birchmount and Enterprise....

    North-east corner of Birchmount and Enterprise. Directly north of the Ciniplex.
  15. Layout is typically done with a total station...

    Layout is typically done with a total station from my understanding, look for a device on a tripod with someone looking into it.

    minimum error is only a few millimetres as well, with constant...
  16. a good idea might be to short turn them at...

    a good idea might be to short turn them at davisville which has 3 platforms..
  17. No it isn't. Our credit rating would be destroyed...

    No it isn't. Our credit rating would be destroyed if we were in that rough of shape. In reality we have a large amount of debt, but nothing dangerous that would require austerity.

    If you can't see...
  18. I noticed pile drivers were on site today, looks...

    I noticed pile drivers were on site today, looks like this one has started.
  19. Replies
    2,555
    Views
    284,937

    Because the TTC didn't agree to anything until...

    Because the TTC didn't agree to anything until 2012.
  20. Welcome to 6 years of construction! The next 4 or...

    Welcome to 6 years of construction! The next 4 or so years will be the worst though.
  21. Replies
    395
    Views
    18,893

    The fund isn't for infrastructure, it's for...

    The fund isn't for infrastructure, it's for transportation. Transportation isn't just transit.
  22. I guess they have decided on all day 2 way...

    I guess they have decided on all day 2 way service in 2015 for Kitchener after all as well, according to that.

    ToAreaFan, time to celebrate.

    This is a politically directed change coming from...
  23. I'm 6' 1", and can only fit comfortably in the...

    I'm 6' 1", and can only fit comfortably in the seats with extra leg room. The TTC subway and streetcars are even worse, there are some seats I can't sit on even if I want to.
  24. that "Alternate route" would roughly double...

    that "Alternate route" would roughly double travel times in that segment, which would take a huge impact on ridership. Its a big detour. travel times from Steeles to the GO station would go from...
  25. The TTC is removing a lot of the closely spaced...

    The TTC is removing a lot of the closely spaced stops as well, and is moving the remaining ones so that they are all at least at signalized intersections. That should help quite a bit, drivers will...