Urban Toronto - Powered by vBulletin

Search:

Type: Posts; User: drum118

Page 1 of 20 1 2 3 4

Search: Search took 0.27 seconds.

  1. I made that that comment years ago when Onestop...

    I made that that comment years ago when Onestop started the program.

    You can have a number of these wall panels along the full length of the platform that are way lager and easier to read than the...
  2. Its 2015 and 4405 has miss another shipping date...

    Its 2015 and 4405 has miss another shipping date as well the rest of the fleet.

    Was surprised that TTC gave out the end of the month time frame for the last write up by the Star or was that...
  3. Not only do we need the DRL, but a new Yonge line...

    Not only do we need the DRL, but a new Yonge line by 2040 at the rate of development is taking place along Yonge St now as well what is on the books. One only has to walk, drive or ride TTC buses on...
  4. If I remember correctly, there is a stop at Front...

    If I remember correctly, there is a stop at Front St and the loop going south. North will be at the loop, Front and King St. North Platform will be part of the sidewalk for Front St with a platform...
  5. Replies
    6,100
    Views
    559,418

    There is nothing stopping have a 3-5-7-9 DD DMU,...

    There is nothing stopping have a 3-5-7-9 DD DMU, other than changing equipment requirements. You can use DMU's until the system is built for EMU's.

    Cost is having non EMU for 30+ years, but could...
  6. Replies
    1,709
    Views
    96,386

    Most Platforms cannot be expanded to fit a full 7...

    Most Platforms cannot be expanded to fit a full 7 car train.

    Closing off doors at the ends will only delay operation more at peak time.

    Since the driver is to have full control and operation...
  7. Dec 26 North parking lot is now fence off with...

    Dec 26
    North parking lot is now fence off with construction trailer on site. Construction to get underway in Jan 2015.
  8. Dec 26 Concrete work is completed with very...

    Dec 26
    Concrete work is completed with very little back filling to be done.

    Steel on site to start the framing of the new south end entrance, as well for the rest of the expansion. They have...
  9. Dec 26: Mod's Parkside Village: The Towns (MCC,...

    Dec 26: Mod's Parkside Village: The Towns (MCC, Blocks 5 & 3, Amacon, 4s Townhouses, EI Richmond Architects Ltd)

    More up on site

    They have used different brick colour than the renderings oncs....
  10. Replies
    10
    Views
    1,243

    1 Junction Rd (Development Site)

    This site covers all the land between Weston Rd and Old Weston as well beside CP Rail Corridor that is currently zone as industrial land.

    The concrete silos are being torn down and another...
  11. Due to the shortage of ballast, Metrolinx is...

    Due to the shortage of ballast, Metrolinx is dealing with it as best as they can, as it is stopping them from getting new tracks install.

    Between the ballast shortage and the TTC issue at Bloor...
  12. Replies
    781
    Views
    117,269

    Those station is what the GO Boys said at the...

    Those station is what the GO Boys said at the official opening of the Transitway in Nov as well before construction started on it. A few new GO routes will be roll out, as well some route changes...
  13. Replies
    6,100
    Views
    559,418

    Mostly New Crew Training and some changing of...

    Mostly New Crew Training and some changing of equipment since CP didn't renew their contract to operate the trains on their line.
  14. Dec 15 & 19 Lot more up on site The residents...

    Dec 15 & 19
    Lot more up on site

    The residents of this project will have to pay the full cost of any sound barrier if they want one due to the rail corridor as well having in on their property....
  15. Dec 19 The Marquee Townhomes (Pinnacle Uptown,...

    Dec 19
    The Marquee Townhomes (Pinnacle Uptown, 5044 Hurontario St, Pinnacle International, 3s, EI Richmond Architects Ltd)

    https://c2.staticflickr.com/8/7551/16066108092_45a8c5352a_b.jpg
    ...
  16. I guess buses have to go as well based on your...

    I guess buses have to go as well based on your comments.

    A big different between the current fleet and the new ones for streetcars. The current fleet lack heat and AC and only have to look at the...
  17. Replies
    781
    Views
    117,269

    Until 2016/17, ridership will be low until the...

    Until 2016/17, ridership will be low until the full completion is finish.

    The quality of service will be poor until full completion and this will have an impact on ridership.

    With the...
  18. Sound Wall Going Up By Dupont. Clear Plastic 1...

    Sound Wall Going Up By Dupont.

    Clear Plastic 1 inch thick.

    Rest of the Railpath post are in for the non sound barrier wall.

    The folks at Wallace Ave Townhouses under construction must pay...
  19. Replies
    781
    Views
    117,269

    Shot this on Dec 3 and forgot it until I upload...

    Shot this on Dec 3 and forgot it until I upload the video along with the other yesterday.

    The ride on 109 took 28 minutes from Sq One to Islington at 1pm. Only 5 on the bus and pick as well drop 1...
  20. Dec 15...

    Dec 15
    https://c1.staticflickr.com/9/8671/16039467552_82474f74e7_b.jpg

    https://c2.staticflickr.com/8/7573/15852724008_80424777c0_b.jpg
    ...
  21. Dec 15 Looking north off the Roger Rd Bridge you...

    Dec 15
    Looking north off the Roger Rd Bridge you can see all 4 tracks north of Black Creek Dr with track 1 & 2 bending to the east.

    If you follow tracks 1-3 south of Black Creek Dr and look at...
  22. Dec 15 Mods check how video is displaying as...

    Dec 15
    Mods check how video is displaying as noted below.

    Here is 607 with Happy Holiday using the tunnel in daylight.

    When they shift the track, they removed the crossing for the contractor...
  23. Replies
    282
    Views
    54,643

    This project included 365-375 Church St and now...

    This project included 365-375 Church St and now includes 377.

    377 apply to the committee to add to the building in Oct and no idea if it was approved or rejected.

    Part of the wall the house...
  24. Dec 15 Weston 2nd train. Thanks to TTC, miss...

    Dec 15 Weston 2nd train.

    Thanks to TTC, miss the first train by 3 minutes. You can hear the whim of the engine as it starts it climb to the top. 4 other videos on line. The camera I use for video...
  25. Even if the base concrete was pour first, TTC...

    Even if the base concrete was pour first, TTC would never do this work in one day using the panel system and allowing for no concrete being pour.

    One only has to watch the next intersection to be...
Results 1 to 25 of 500
Page 1 of 20 1 2 3 4