Urban Toronto - Powered by vBulletin

Search:

Type: Posts; User: drum118

Page 1 of 20 1 2 3 4

Search: Search took 0.16 seconds.

  1. All the videos are up on site for the bridge...

    All the videos are up on site for the bridge move. Still have to stitch them as one and create a fast short move.

    I should had started to record the last CP train earlier as the engineer lay on...
  2. DQ opens today Have shots from 26, but back...

    DQ opens today

    Have shots from 26, but back log by 10 days and 1,500 photos ahead of them.

    At least the retail is going quick compare to other places that are still empty after 5 years. With...
  3. I agree with most of your comments and add this....

    I agree with most of your comments and add this.

    Both Alterra and Park Place are still not 100% sold after they were built a few years ago. I believe the one by Kennedy is in the same boat, but...
  4. The person who know best said they were not to be...

    The person who know best said they were not to be part of the 6 and would remain as trainers until there was enough on hand for them to head to Thunder Bay
  5. No. As I stated elsewhere, Its in Metrolinx...

    No.

    As I stated elsewhere, Its in Metrolinx plan, but when is still up in the air.

    There is a report to come back in the fall on some sort of timetable on various things with the DRL being one...
  6. No I don't work for any transit system. My...

    No I don't work for any transit system.

    My background is in construction. I work my way up the ladder from engineering drawing to part owner.

    I have been a Transit and Urban advocate since 2000...
  7. The only reason there was a 2nd bid was to try to...

    The only reason there was a 2nd bid was to try to keep a foot in the door since it was a given the order was going to Thunder Bay in the first place.

    If the 2031 date does happen or come close, it...
  8. Of course I haven't and will not, as it under the...

    Of course I haven't and will not, as it under the other threads for the corridor. Don't have the time and not spoon feeding people for all the info.
  9. Come on, the west side of the corridor. Geee!!!!...

    Come on, the west side of the corridor. Geee!!!! There is an area over King St that can support 3 car train and up to 5 cars with a narrow platform to the south. I posted a photo of it and the area...
  10. As I stated in the past, the only spot for a...

    As I stated in the past, the only spot for a station for Liberty Village is at King St on the west side that can be use by any type of train, but better suited for short trains. There is no room on...
  11. A must

    A must
  12. The stop proposed don't have to be for REX, but a...

    The stop proposed don't have to be for REX, but a new type of service by GO.

    The ones proposed for the West side are almost the same as mine, but need ones at Dixie, Lorne Park, around Kerr St,...
  13. While I was at West Toronto Site Friday/Sat,...

    While I was at West Toronto Site Friday/Sat, didn't see 4404 that supposed to be here this weekend and looks like another miss date.

    This leave 6 weeks to get 5 cars from Thunder Bay to meet Aug...
  14. 3.5 hours early and could have been 4.5-5 if the...

    3.5 hours early and could have been 4.5-5 if the excavators didn't have issues with the north-west concrete work for the temporary bridge support.

    CP Crews started to cut track 2/south track at...
  15. If you look at the west end of the Union Station...

    If you look at the west end of the Union Station inside before the Path walkway, they have built what looks to me a check-in area for the UPX and a fair walking distance to the platform itself. The...
  16. Replies
    1,513
    Views
    222,842

    You run it along the top of the valley. You need...

    You run it along the top of the valley. You need to tear everything down that exist there today regardless of what it and any historical value. Best place to stop it is at Don Mills and close it off...
  17. Replies
    5,734
    Views
    519,627

    If you drive to a GO station, you are creating...

    If you drive to a GO station, you are creating gridlock and traffic issues in the first place "IF" there is transit to it as well quality service in your area. This is the "NEXT BIG STEP" Metrolinx...
  18. Replies
    4,055
    Views
    300,045

    Metrolinx has made it clear that an DRL is needed...

    Metrolinx has made it clear that an DRL is needed regardless what is done on the RH line or any of its lines. There will be more stations added to the RH line.

    As for time line, it can be 0-50...
  19. Replies
    10,657
    Views
    2,063,816

    June 26 Got to fix these and the camera needs to...

    June 26
    Got to fix these and the camera needs to go in for a cleaning
    https://c1.staticflickr.com/3/2929/14515693984_b26e086077_b.jpg
    ...
  20. Replies
    952
    Views
    57,459

    4206 wrote off an expensive car by Simcoe today...

    4206 wrote off an expensive car by Simcoe today when it made a u-turn in front of it and trapping the diver in it. There were 4 ALRV's line up on the east side going west and expected a few more...
  21. The elevation between Fort York and Bathurst is a...

    The elevation between Fort York and Bathurst is a slight grade.

    The road is ready for paving, but will not open until the new handrails are in place, or fence off until they are.

    Only a small...
  22. Replies
    5,734
    Views
    519,627

    All lines outside the GTAH area will see...

    All lines outside the GTAH area will see electrification with funds coming from a different pot for funding them, not cover in the current $16B. I still say the price tag is too high considering the...
  23. They call it a bridge, but I call it a deck span...

    They call it a bridge, but I call it a deck span as it does not meet the standards of a true bridge, other than you can drive & walk on it.

    People do get confuse as to the crossing name since the...
  24. June 19...

    June 19
    https://farm4.staticflickr.com/3894/14508672225_2eb89612d5_b.jpg

    https://farm4.staticflickr.com/3870/14505291741_5746dbdd47_b.jpg
    ...
  25. June 19 They are getting ready to cap the east...

    June 19
    They are getting ready to cap the east tower and the west tower in the next 2 weeks. Lot more on site.
    https://farm4.staticflickr.com/3887/14322049818_80f941cd0b_b.jpg
    ...
Results 1 to 25 of 500
Page 1 of 20 1 2 3 4